Job No.: TCS00694/13 |
|
|
||
|
|
|
|
|
||
|
|
Agreement No. CE 45/2008
(CE) Liantang/ Heung Yuen Wai
Boundary Control Point
and Associated Works |
|
|
||
|
|
|
|
|
||
|
|
Monthly Environmental Monitoring and Audit Report
(No.86) ¡V September 2020 |
|
|
||
|
|
Prepared For |
|
|
||
|
|
Civil Engineering and Development Department (CEDD) |
|
|
||
Date |
Reference No. |
Prepared By |
Certified By |
14 October 2020 |
TCS00694/13/600/R2522v2 |
|
|
Nicola Hon (Environmental Consultant) |
Tam Tak Wing (Environmental Team Leader) |
Version |
Date |
Remarks |
1 |
9 October 2020 |
First Submission |
2 |
14 October 2020 |
Amended against IEC¡¦s comments |
|
|
|
executive summary
ES01
This is the 86th monthly Environmental Monitoring & Audit (EM&A) report
presenting the monitoring results and inspection findings for the reporting period from 1 to 30 September 2020 (hereinafter
¡¥the Reporting Period¡¦).
Environmental
Monitoring and Audit Activities
ES02
To facilitate the project management and
implementation, Liantang/Heung Yuen Wai
Boundary Control Point and Associated Works of the Project is
divided to six CEDD contracts
including Contract 2 (CV/2012/08), Contract 3 (CV/2012/09), Contract 4 (NE/2014/02), Contract 5 (CV/2013/03),
Contract 6 (CV/2013/08) and Contract 7 (NE/2014/03) and an ArshSD
contract (Contract SS C505).
ES03
In the Reporting Period, environmental monitoring activities under the EM&A programme in the
Reporting Period are summarized in the following table.
Environmental Aspect |
Environmental
Monitoring Parameters / Inspection |
Reporting Period |
|
Number of Monitoring
Locations to undertake |
Total Occasions |
||
Air Quality |
1-hour TSP |
7 (#) |
126 |
24-hour TSP |
7 (#) |
38 |
|
Construction Noise |
Leq(30min) Daytime |
8 (~) |
40 |
Water Quality |
Water in-situ
measurement and/or sampling |
WM1 & WM1-C |
13 Scheduled &
0 extra |
WM2A(a) & WM2A-Cx |
13 Scheduled &
0 extra |
||
WM2B & WM2B-C |
13 Scheduled &
0 extra (*) |
||
WM3x &WM3-C |
13 Scheduled &
0 extra (*) |
||
WM4, WM4-CA &WM4-CB |
13 Scheduled &
0 extra |
||
Ecology |
Woodland compensation i) General Health condition of planted species ii) Survival of planted species |
9 Quadrats and transect |
0 |
Wetland compensation i)
Site inspection |
Contract 6 |
5 |
|
Joint Site Inspection / Audit |
IEC, ET, the Contractor and RE joint site
Environmental Inspection and Auditing |
Contract 3 |
5 |
Contract 6 |
5 |
Remark:
(*)
Water sampling was unable to
carry out at WM2B and WM2B-C in the Reporting Period due to shallow water. Besides, WM3-C
was also unable to carry out in some of the monitoring days due to shallow
water. (Water depth under
150mm).
(#)
Number of air monitoring location changed to 7 since the partial termination
proposal approved by EPD on 9 Jul 2020.
(~)
Number of noise monitoring location changed to 8 since the partial termination
proposal approved by EPD on 9 Jul 2020.
Action and Limit (A/L) Levels exceedance
ES04
In the Reporting Period, no exceedance was recorded for
construction noise, air
quality and water quality monitoring. The summary of exceedance in the
Reporting Period is shown below.
Environmental
Aspect |
Monitoring Parameters |
Action Level |
Limit Level |
Event & Action |
|||
NOE Issued |
Investigation Result |
Project related exceedance |
Corrective Actions |
||||
Air Quality |
1-hour TSP |
0 |
0 |
0 |
-- |
-- |
-- |
24-hour TSP |
0 |
0 |
0 |
-- |
-- |
-- |
|
Construction Noise |
Leq(30min) Daytime |
0 |
0 |
0 |
-- |
-- |
-- |
Water Quality |
DO |
0 |
0 |
0 |
-- |
-- |
-- |
Turbidity |
0 |
0 |
0 |
-- |
-- |
||
SS |
0 |
0 |
0 |
Environmental
Complaint
ES05
No environmental
complaint was recorded in the Reporting Period.
Notification
of Summons and Successful Prosecutions
ES06
No environmental
summons and prosecutions were recorded in the Reporting Period.
Reporting Change
ES07
No reporting
change was recorded in the Reporting period.
Site Inspection
ES08
In the Reporting Period, joint site
inspection to evaluate the site environmental performance at Contract
3 has been carried out by the RE, ET, IEC and the Contractor on 2, 9, 16, 23 and 29 September 2020. No non-compliance was noted during the site inspection.
ES09
In the Reporting Period, joint site
inspection to evaluate the site environmental performance at Contract
6 has been carried out by the RE, ET, IEC and the Contractor on 2, 9, 16, 24 and 29 September 2020. No non-compliance was noted during the site inspection.
Future Key Issues
ES10
In forthcoming dry season and in consideration of
construction site under the Project are located adjacent to villages, the
Contractors should fully implement air quality mitigation measures to reduce
construction dust emission.
ES11
In addition, all
effluent discharge shall be ensure to fulfill Technical Memorandum of Effluent
Discharged into Drainage and Sewerage Systems, inland and Coastal Waters
criteria or discharge permits stipulation.
ES12
Construction noise would be a key
environmental issue during construction work of the Project. Noise mitigation measures such as using
quiet plants should be implemented in accordance with the EM&A requirement.