Name of Department : CEDD Contract No./ Work Order No. : CV/2012/08
(All quantities shall be rounded off to 3 decimal places)
Month | Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) | Actual Quantities of Other C&D Materials / Wastes Generated | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantities Generated [a+b+c+d) | Broken Concrete (including rock for recycling into aggregates) (a) | Reused in the Contract (b) | Reused in Other Projects (c) | Disposed as Public Fill (d) | Imported C&D Material | Metal (in '000kg) | Paper/ Cardboard Packaging (in '000kg) | Plastic (Recycled) (in '000kg) | Chemical Waste (in '000kg) | Others (e.g. General Refuse etc.) (in '000 m3) (in '000m3) | |
January | 72.9008 | 0.0000 | 2.0045 | 31.5900 | 39.3063 | 9.1064 | 0.1440 | 0.3600 | 1.9179 | 1.7600 | 0.3210 |
February | 85.5922 | 0.0000 | 1.4413 | 29.9165 | 54.2343 | 8.4347 | 0.0769 | 0.3000 | 2.1663 | 4.3480 | 0.3365 |
March | 36.8512 | 0.0000 | 0.5903 | 33.0669 | 3.1940 | 7.7980 | 0.3892 | 0.4000 | 1.3527 | 4.0720 | 0.4167 |
April | 41.5646 | 0.0000 | 1.2335 | 33.1649 | 7.1663 | 7.9084 | 0.4200 | 0.3200 | 2.0268 | 13.0254 | 0.3862 |
May | 38.2030 | 0.0000 | 0.4115 | 33.2084 | 4.5830 | 8.3119 | 0.4765 | 0.3700 | 2.7135 | 3.5440 | 0.3907 |
June | 38.4359 | 0.0000 | 0.6721 | 13.5900 | 24.1738 | 8.0061 | 0.0917 | 0.3300 | 3.3687 | 4.8760 | 0.3265 |
Half-year total | 313.5477 | 0.0000 | 6.3533 | 174.5367 | 132.6577 | 49.5655 | 1.5983 | 2.0800 | 13.5459 | 31.6254 | 2.1777 |
July | 85.5801 | 0.0000 | 1.2343 | 2.8380 | 81.5079 | 8.2250 | 0.0802 | 0.3200 | 2.0394 | 1.5080 | 0.5330 |
August | 73.2350 | 0.0000 | 0.3805 | 0.8032 | 72.0514 | 8.4800 | 0.0311 | 0.3500 | 2.4100 | 1.6840 | 0.5071 |
September | 69.9895 | 0.0000 | 0.0705 | 1.4936 | 68.4254 | 7.1930 | 0.0423 | 0.3400 | 2.1170 | 1.1560 | 0.5672 |
October | 0.0000 | ||||||||||
November | 0.0000 | ||||||||||
December | 0.0000 | ||||||||||
Yearly Total | 542.3523 | 0.0000 | 8.0385 | 179.6715 | 354.6423 | 73.4635 | 1.7519 | 3.0900 | 20.1123 | 35.9734 | 3.7849 |
(All quantities shall be rounded off to 3 decimal places)
Year | D Materials Generated / Imported (in '000 m3) | Actual Quantities of Other C&D Materials / Wastes Generated | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantities Generated [a+b+c+d) | Broken Concrete (including rock for recycling into aggregates) (a) | Reused in the Contract (b) | Reused in Other Projects (c) | Disposed as Public Fill (d) | Imported C&D Material | Metal (in '000kg) | Paper/ Cardboard Packaging (in '000kg) | Plastic (Recycled) (in '000kg) | Chemical Waste (in '000kg) | Others (e.g. General Refuse etc.) (in '000 m3) (in '000m3) | |
2013 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 |
2014 | 425.4406 | 0.0000 | 2.7362 | 376.3945 | 46.3099 | 5.6245 | 3.2100 | 0.4390 | 0.0070 | 10.8800 | 2.2609 |
2015 | 570.9459 | 0.0000 | 20.8159 | 543.2162 | 6.9138 | 4.5492 | 14.1300 | 3.9220 | 11.9700 | 16.1920 | 1.1696 |
2016 | 905.0989 | 0.0000 | 7.4372 | 427.7834 | 469.8783 | 24.8350 | 259.2290 | 3.8500 | 18.7262 | 34.2936 | 1.9720 |
2017 | 542.3523 | 0.0000 | 8.0385 | 179.6715 | 354.6423 | 73.4635 | 1.7519 | 3.0900 | 20.1123 | 35.9734 | 3.7849 |
2018 | |||||||||||
Total | 2443.8377 | 0.0000 | 39.0278 | 1527.0657 | 877.7443 | 108.4721 | 278.3209 | 11.3010 | 50.8155 | 97.3390 | 9.1874 |
Remark: | |||||
---|---|---|---|---|---|
1) Density of C&D material to be | 2.2 | metric ton/m3 | 3) Density of Spent Oil to be | 0.88 | metric ton/m3 |
2) Density of General Refuse to be | 1.6 | metric ton/m3 |
Name of Department: CEDD Contract No.: CV/2012/09
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in m3) | (in '000m3) | |
Jan | 1.150 | 0.204 | 0.150 | 0.000 | 0.796 | 1.150 | 0.000 | 0.000 | 0.001 | 0.000 | 0.170 |
Feb | 1.160 | 0.308 | 0.192 | 0.000 | 0.660 | 0.926 | 0.000 | 0.000 | 0.001 | 0.000 | 0.140 |
Mar | 2.287 | 0.565 | 0.060 | 0.000 | 1.662 | 1.055 | 0.000 | 0.000 | 0.000 | 0.000 | 0.115 |
Apr | 1.004 | 0.064 | 0.036 | 0.000 | 0.903 | 0.463 | 0.000 | 0.000 | 0.004 | 0.000 | 0.075 |
May | 0.497 | 0.005 | 0.120 | 0.000 | 0.372 | 0.050 | 0.767 | 0.000 | 0.000 | 0.000 | 0.105 |
Jun | 1.249 | 0.150 | 0.150 | 0.000 | 0.948 | 0.008 | 0.000 | 0.000 | 0.000 | 0.000 | 0.135 |
Sub-total | 7.347 | 1.297 | 0.708 | 0.000 | 5.342 | 3.651 | 0.767 | 0.000 | 0.006 | 0.000 | 0.740 |
Jul | 1.917 | 0.180 | 0.120 | 0.000 | 1.617 | 0.542 | 0.000 | 0.000 | 0.000 | 0.000 | 0.065 |
Aug | 1.297 | 0.118 | 0.120 | 0.000 | 1.059 | 0.099 | 0.000 | 0.000 | 0.000 | 0.000 | 0.130 |
Sep | 2.448 | 0.437 | 0.090 | 0.000 | 1.921 | 0.291 | 0.000 | 0.000 | 0.000 | 0.000 | 0.115 |
Oct | |||||||||||
Nov | |||||||||||
Dec | |||||||||||
Total | 13.009 | 2.032 | 1.038 | 0.000 | 9.939 | 4.583 | 0.767 | 0.000 | 0.006 | 0.000 | 1.050 |
Note: 1. Assume the density of soil fill is 2 ton/m3 .
Forecast of Total Quantities of C&D Materials to be Generated from the Contract | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Diposal as Public Fill | Imported Fill | Metals | Paper/card board packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) |
52.5 | 5.2 | 12.3 | 0.0 | 35.0 | 41.8 | 5.0 | 1.0 | 1.0 | 0.5 | 44.8 |
Notes: | (1) | The performance targets are given in PS Clause 6(14). |
(2) | The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site. | |
(3) | Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material. | |
(4) | The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, | |
together with a breakdown of the nature where the total amount of C&D materials expected to be generated from the Works if equal to | ||
or exceed 50,000 m3 . |
SUMMARY TABLE FOR WORK PROCESSES OR ACTIVITIES REQUIRING TIMBER FOR TEMPORARY WORKS
Contract No.: CV/2012/09 Contract Title: Liantang /Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 3
Actual
Est. Quantities of Description of Works Process or Activity
Justifications for Using Timber in
Quantities Item No.
Remarks
[see note (a) below]
Temporary Construction Works
Timber Used (m3) Used (m3)
Formwork for concreting the Stem wall
1
Easy handling by manpower
4.53
3.96
bay4 of noise barrier NB67 Formwork for concreting the Stem wall
1
Easy handling by manpower
5.17
4.15
bay4 of noise barrier NB73
Total Estimated Quantity of Timber
9.70
Used
(a) The Contractor shall list out all the work items requiring timber for use in temporary construction works. Several minor workNotes: items may be grouped into one for ease of updating.
(b) The summary table shall be submitted to the Engineer's Representative monthly together with the Waste Flow Table for review and monitoring in accordance with the PS Clause 25.24(11)..
Appendix A | ||||
---|---|---|---|---|
Name of Department: | CEDD | Contract No.: NE/2014/02 | ||
Monthly Summary Waste Flow Table for 2017 |
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000 kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) | |
2016 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Jan-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Feb-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Mar-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Apr-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
May-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Jun-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Jul-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Aug-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Sep-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Oct-17 | |||||||||||
Nov-17 | |||||||||||
Dec-17 | |||||||||||
Total | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Forecast of Total Quantities of C&D Materials to be Generated from the Contract* | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000 kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) |
0.500 | 0.000 | 0.000 | 0.000 | 0.500 | 0.000 | 0.500 | 0.200 | 0.000 | 0.000 | 0.200 |
Notes :
Name of Person completing the record: K.M. Lui (EO) Project : Liangtang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 Contract No.: CV/2013/08
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in ‘000m3) | (in '000 kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in ‘000 m3) | |
Jan | 40.128 | 0 | 19.297 | 6.067 | 14.764 | 0 | 0 | 0.171 | 0 | 0 | 0.065 |
Feb | 48.065 | 0 | 16.328 | 7.123 | 24.614 | 0 | 0 | 0.294 | 0 | 0 | 0.107 |
Mar | 49.230 | 0 | 5.661 | 15.029 | 28.540 | 0 | 0 | 0.494 | 0 | 0 | 0.217 |
Apr | 52.348 | 0 | 10.824 | 31.732 | 9.792 | 0 | 0 | 0.331 | 0 | 0.290 | 0.162 |
May | 47.339 | 0 | 24.850 | 12.383 | 10.106 | 0 | 0 | 0 | 0 | 0 | 0.228 |
Jun | 1.108 | 0 | 0 | 0 | 1.108 | 0 | 0 | 0.285 | 0 | 0 | 0.258 |
Sub-total | 238.218 | 0 | 76.960 | 72.334 | 88.92418 | 0 | 0 | 1.575 | 0 | 0.29 | 1.037 |
Jul | 0.934 | 0 | 0 | 0 | 0.934 | 0 | 0 | 0.360 | 0 | 0 | 0.288 |
Aug | 1.656 | 0 | 0.432 | 0 | 1.224 | 0 | 0 | 0.291 | 0 | 0 | 0.510 |
Sep | 4.210 | 0 | 1.386 | 0 | 2.824 | 0 | 0 | 0 | 0 | 0 | 0.513 |
Oct | |||||||||||
Nov | |||||||||||
Dec | |||||||||||
Total | 988.180 | 0 | 162.469 | 270.626 | 555.08555 | 53.939 | 0 | 4.999 | 0.007 | 34.045 | 7.2 |
Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.
MONTHLY SUMMARY WASTE FLOW TABLE
Name of Department: | CEDD | |||
---|---|---|---|---|
Contract Title: | Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 7 | Contract No.: | NE/2014/03 | |
Monthly Summary Waste Flow Table for | 2017 (year) |
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of Inert C&D Wastes Generated Monthly | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Contract Reused in the | Reused in other Projects | Public Fill Disposed as | Imported Fill | Metals | Paper/cardboard packaging | Plastic (see Note 3) | Chemical Waste | Others, e.g. general refuse | ||
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) | ||
Jan | 0 | 0 | 0 | 0 | 0 | 0 | 0.1 | 0.05 | 0.001 | 0 | 0.01 | |
Feb | 0 | 0 | 0 | 0 | 0 | 0 | 0.5 | 0.04 | 0.001 | 0 | 0.015 | |
Mar | 0.822 | 0 | 0 | 0 | 0.822 | 0 | 2.2 | 0.04 | 0.001 | 0 | 0.025 | |
Apr | 1.473 | 0 | 0 | 0 | 1.473 | 0 | 3.1 | 0.04 | 0.001 | 0 | 0.02 | |
May | 1.129 | 0 | 0 | 0 | 1.129 | 0 | 4.5 | 0.04 | 0.001 | 0 | 0.03 | |
June | 0.317 | 0 | 0 | 0 | 0.317 | 0 | 4 | 0.04 | 0.001 | 0 | 0.04 | |
Sub-total | 3.741 | 0 | 0 | 0 | 3.741 | 0 | 14.4 | 0.25 | 0.006 | 0 | 0.14 | |
July | 0.931 | 0 | 0 | 0 | 0.931 | 0 | 2 | 0.04 | 0.001 | 0 | 0.025 | |
Aug | 0 | 0 | 0 | 0 | 0 | 0 | 2.5 | 0.04 | 0.001 | 0 | 0.01 | |
Sept | 0.068 | 0 | 0 | 0 | 0.068 | 0 | 2 | 0.04 | 0.001 | 0 | 0.01 | |
Oct | ||||||||||||
Nov | ||||||||||||
Dec | ||||||||||||
Total | 4.74 | 0 | 0 | 0 | 4.74 | 0 | 20.9 | 0.37 | 0.009 | 0 | 0.185 |
Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.
(2) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
SSC505
Monthly Summary Waste Flow Table for 2017 [year] [to be submitted not later than the 15th day of each month following reporting month] (All quantities shall be rounded off to 3 decimal places.)
Month | Actual Quantities of Inert Construction Waste Generated Monthly | ||||
---|---|---|---|---|---|
(a)=(b)+(c)+(d)+(e) Total Quantity Generated | (b) Broken Concrete (see Note 4) | (c) Reused in the Contract | (d) Reused in other Projects | (e) Disposed of as Public Fill | |
(in ‘000m3) | (in ‘000m3) | (in ‘000m3) | (in ‘000m3) | (in ‘000m3) | |
Jan | 3.160 | 0.000 | 2.003 | 0.000 | 1.157 |
Feb | 1.374 | 0.000 | 0.249 | 0.000 | 1.125 |
Mar | 0.548 | 0.000 | 0.054 | 0.000 | 0.494 |
Apr | 4.136 | 0.013 | 1.139 | 0.000 | 2.984 |
May | 4.201 | 0.000 | 1.191 | 0.000 | 3.010 |
Jun | 9.813 | 0.000 | 1.317 | 0.000 | 8.496 |
Sub-total | 23.230 | 0.013 | 5.953 | 0.000 | 17.264 |
Jul | 9.101 | 0.000 | 1.223 | 0.000 | 7.878 |
Aug | 6.341 | 0.000 | 2.532 | 0.000 | 3.809 |
Sep | 5.142 | 0.000 | 4.992 | 0.000 | 0.150 |
Oct | - | - | - | - | - |
Nov | - | - | - | - | - |
Dec | - | - | - | - | - |
Total | 43.814 | 0.013 | 14.700 | 0.000 | 29.101 |
Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011
Page 1
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
Month | Actual Quantities of Non-inert Construction Waste Generated Monthly | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Timber | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Other Recyclable Materials (see Page 3) | General Refuse disposed of at Landfill | |||||||
(in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000m3) | |||||||
generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | |
Jan | 0.000 | 0.000 | 458.150 | 458.150 | 0.560 | 0.560 | 0.058 | 0.058 | 0.000 | 0.000 | 0.024 | 0.024 | 0.481 |
Feb | 0.000 | 0.000 | 177.180 | 177.180 | 0.370 | 0.370 | 0.036 | 0.036 | 0.000 | 0.000 | 0.008 | 0.008 | 0.280 |
Mar | 0.000 | 0.000 | 97.370 | 97.370 | 3.380 | 3.380 | 1.573 | 1.573 | 0.000 | 0.000 | 0.036 | 0.036 | 0.423 |
Apr | 0.000 | 0.000 | 148.110 | 148.110 | 0.300 | 0.300 | 1.223 | 1.223 | 0.000 | 0.000 | 29.795 | 29.795 | 0.358 |
May | 0.000 | 0.000 | 405.500 | 405.500 | 0.440 | 0.440 | 0.040 | 0.040 | 0.000 | 0.000 | 0.006 | 0.006 | 0.644 |
Jun | 0.000 | 0.000 | 338.580 | 338.580 | 0.710 | 0.710 | 0.036 | 0.036 | 0.000 | 0.000 | 0.002 | 0.002 | 0.878 |
Sub-total | 0.000 | 0.000 | 1624.890 | 1624.890 | 5.020 | 5.020 | 2.926 | 2.926 | 0.000 | 0.000 | 29.871 | 29.871 | 3.062 |
Jul | 0.000 | 0.000 | 296.540 | 296.540 | 0.650 | 0.650 | 1.040 | 1.040 | 0.000 | 0.000 | 0.002 | 0.002 | 1.651 |
Aug | 0.000 | 0.000 | 239.720 | 239.720 | 0.700 | 0.700 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 1.554 |
Sep | 0.000 | 0.000 | 68.060 | 68.060 | 0.570 | 0.570 | 1.037 | 1.037 | 0.000 | 0.000 | 0.001 | 0.001 | 1.606 |
Oct | - | - | - | - | - | - | - | - | - | - | - | - | - |
Nov | - | - | - | - | - | - | - | - | - | - | - | - | - |
Dec | - | - | - | - | - | - | - | - | - | - | - | - | - |
Total | 0.000 | 0.000 | 2229.210 | 2229.210 | 6.940 | 6.940 | 5.003 | 5.003 | 0.000 | 0.000 | 29.873 | 29.873 | 7.872 |
Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011
Page 2
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
Description of mode and details of recycling if any for the month e.g. XX kg of used timber was sent to YY site for transformation into fertilizers | |||||
---|---|---|---|---|---|
1kg of cans were sent to Kong Hung for recycling. | 570kg of papers were sent to Wai San for recycling. | 37kg of plastic bottles were sent to Action Health for recycling. 1000kg of plastic barrier were sent to Forest Hill for recycling. | 68.06 tons of scrap metals from LCAL were sent to Hop Hing Metal Works and Wai Hung for recycling |
Notes: | (1) | The performance targets are given in the Particular Specification on Environmental Management Plan. |
(2) | The waste flow table shall also include construction waste that are specified in the Contract to be imported for use at the site. | |
(3) | Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material. | |
(4) | Broken concrete for recycling into aggregates. | |
(5) | If necessary, use the conversion factor: 1 full load of dumping truck being equivalent to 6.5 m3 by volume. |
Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011
Page 3