Dragages QSE Lock-up

Name of Department : CEDD Contract No./ Work Order No. : CV/2012/08

Appendix I - Monthly Summary Waste Flow Table for 2016

(All quantities shall be rounded off to 3 decimal places)

Month Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) Actual Quantities of Other C&D Materials / Wastes Generated
Total Quantities Generated [a+b+c+d) Broken Concrete (including rock for recycling into aggregates) (a) Reused in the Contract (b) Reused in Other Projects (c) Disposed as Public Fill (d) Imported C&D Material Metal (in '000kg) Paper/ Cardboard Packaging (in '000kg) Plastic (bottles/containers, plastic sheets/ foams from package material) (in '000kg) Chemical Waste (in '000kg) Others (e.g. General Refuse etc.) (in '000m3)
January 74.4242 0.0000 0.6482 32.5036 41.2724 0.5518 0.0000 0.0000 0.0000 0.8800 0.1247
February 0.0000
March 0.0000
April 0.0000
May 0.0000
June 0.0000
Half-year total 74.4242 0.0000 0.6482 32.5036 41.2724 0.5518 0.0000 0.0000 0.0000 0.8800 0.1247
July 0.0000
August 0.0000
September 0.0000
October 0.0000
November 0.0000
December 0.0000
Yearly Total 74.4242 0.0000 0.6482 32.5036 41.2724 0.5518 0.0000 0.0000 0.0000 0.8800 0.1247

(All quantities shall be rounded off to 3 decimal places)

Year Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) Actual Quantities of Other C&D Materials / Wastes Generated
Total Quantities Generated [a+b+c+d) Broken Concrete (including rock for recycling into aggregates) (a) Reused in the Contract (b) Reused in Other Projects (c) Disposed as Public Fill (d) Imported C&D Material Metal (in '000kg) Paper/ Cardboard Packaging (in '000kg) Plastic (bottles/containers, plastic sheets/ foams from package material) (in '000kg) Chemical Waste (in '000kg) Others (e.g. General Refuse etc.) (in '000m3)
2013 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2014 425.4406 0.0000 2.7362 376.3945 46.3099 5.6245 3.2100 0.4390 0.0070 10.8800 2.2609
2015 570.9459 0.0000 20.8159 543.2162 6.9138 4.5492 14.1300 3.9220 1.5000 16.1920 1.1696
2016 74.4242 0.0000 0.6482 32.5036 41.2724 0.5518 0.0000 0.0000 0.0000 0.8800 0.1247
2017
2018
Total 1070.8107 0.0000 24.2003 952.1144 94.4961 10.7255 17.3400 4.3610 1.5070 27.9520 3.5552
Remark:
1) Density of C&D material to be 2.2 metric ton/m3 3) Density of Spent Oil to be 0.88 metric ton/m3
2) Density of General Refuse to be 1.6 metric ton/m3

itectural S

Monthly Summary Waste Flow Table for 2015 (year)

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in m3) (in '000m3)
Jan 3.864 0.105 0.648 0.000 3.216 0.118 0.000 0.000 0.000 0.040 0.080
Feb 2.429 0.049 1.518 0.000 0.911 0.100 0.000 0.000 0.003 0.900 0.070
Mar 3.713 0.029 0.270 0.000 3.443 0.100 0.000 0.000 0.006 0.000 0.080
Apr 3.597 0.115 2.308 0.000 1.289 0.090 0.003 0.000 0.000 0.000 0.065
May 1.357 0.197 0.108 0.000 1.249 0.100 0.000 0.000 0.012 0.000 0.065
Jun 2.515 0.053 0.840 0.000 1.675 0.125 0.000 0.000 0.030 0.800 0.060
Sub-total 17.475 0.547 5.692 0.000 11.783 0.633 0.003 0.000 0.051 1.740 0.420
Jul 1.177 0.030 0.351 0.000 0.826 1.564 0.000 0.000 0.000 0.000 0.065
Aug 1.966 0.164 0.294 0.000 1.672 0.956 0.002 0.000 0.001 0.000 0.130
Sep 2.092 0.027 0.264 0.000 1.828 1.141 0.000 0.000 0.001 0.000 0.115
Oct 2.462 0.381 1.500 0.000 0.962 0.226 0.000 0.000 0.001 0.000 0.125
Nov 2.990 0.709 1.200 0.000 1.790 0.066 0.001 0.000 0.000 0.000 0.130
Dec 3.158 0.174 1.600 0.000 1.558 0.259 0.000 0.000 0.001 0.600 0.145
Total 31.320 2.033 10.901 0.000 20.419 4.846 0.006 0.000 0.055 2.340 1.130

Apr

  1. Assume the density of rock and broken concrete is 2.5 ton/m3 .
  2. Assume each truck of C&D wastes is 5m3 .
  3. The inert C&D materials except slurry and bentonite are disposed at Tuen Mun 38.
  4. The slurry and bentonite are disposed at Tseung Kwun O 137.
  5. The non-inert C&D wastes are disposed at NENT.
  6. Assume the density of metal is 7,850 kg/m3 .

Name of Department: CEDD Contract No.: CV/2012/09

Monthly Summary Waste Flow Table for 2016 (year)

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in m3) (in '000m3)
Jan 2.430 0.253 0.030 0.000 2.400 0.799 0.001 0.000 0.000 0.000 0.115
Feb
Mar
Apr
May
Jun
Sub-total 2.430 0.253 0.030 0.000 2.400 0.799 0.001 0.000 0.000 0.000 0.115
Jul
Aug
Sep
Oct
Nov
Dec
Total 2.430 0.253 0.030 0.000 2.400 0.799 0.001 0.000 0.000 0.000 0.115

Note: 1. Assume the density of soil fill is 2 ton/m3 .

  1. Assume the density of rock and broken concrete is 2.5 ton/m3 .
  2. Assume each truck of C&D wastes is 5m3 .
  3. The inert C&D materials except slurry and bentonite are disposed at Tuen Mun 38.
  4. The slurry and bentonite are disposed at Tseung Kwun O 137.
  5. The non-inert C&D wastes are disposed at NENT.
  6. Assume the density of metal is 7,850 kg/m3 .
Contract No. CV/2013/03 Particular Specification Appendix 1.27 Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5
Name of Department: CEDD
Monthly Summary Waste Flow Table for 2015
Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
JAN 0 0 0 0 0 33.3285 4.16 0.24 0 0 0.42
FEB 0 0 0 0 0 11.82 0.99 0 0 0 0.18
MAR 0 0 0 0 0 8.592 0 0 0 0 0.375
APRIL 0 0 0 0 0 12.81 0 0 0 0 0.04
MAY 0 0 0 0 0 16.609 0 0.154 0 0 0
JUN 0 0 0 0 0 13.676 0 0 0 0 0.015
Sub Total 0 0 0 0 0 96.8355 5.15 0.394 0 0 1.03
JUL 0 0 0 0 0 10.285 0 0 0 0 0.02
AUG 0 0 0 0 0 9.129 0 0 0 0 0.43
SEP 0 0 0 0 0 2.457 0 0 0 0 0.005
OCT 0 0 0 0 0 16.218 0 0.099 0 0 0.145
NOV 0 0 0 0 0 5.823 0 0 0 0 0.030
DEC 0 0 0 0 0 0.283 0 0 0 0 0.07
Total 0 0 0 0 0 141.03 5.15 0.493 0 0 1.73

Notes:

Contract No. CV/2013/03 Particular Specification Appendix 1.27

Name of Department: CEDD

Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5

Forecast of Total Quantities of C&D Materials to be Generated from the Contract (see Note 4)
Total Quantity Generated Hard Rocks and Large Broken Concrete Reused in the Contract Reused in Other Projects Disposed as Public Fill Imported Fill Metal Paper / cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
0 0 0 0 0 350 30 4 2 1 4

Notes:

(1)
The performance targets are given in PS clause 6(14) above.
(2)
The waste flow table shall also include C&D materials that are specified in the Contractor to be imported for use at the Site.
(3)
Plastic refer to plastic bottles/containers, plastic sheets/foam from packaging material.
(4)
The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the nature

- Hard Rocks and Large Broken Concrete = Cannot be defined at this stage

-Imported Fill = Estimated by the Contractor = 1 loading = 8m 3

-Metal = Estimated by the Contractor

-Paper/cardboard packaging = Estimated by the Contractor

-Plastics = Estimated by the Contractor

- Chemical Waste = Estimated by the Contractor (Spent lubricating oil, assume density 0.9kg/L)

-Other, e.g. general refuse = Estimated by the Contractor

Contract No. CV/2013/03 Particular Specification Appendix 1.27 Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5
Name of Department: CEDD
Monthly Summary Waste Flow Table for 2016
Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
JAN 0 0 0 0 0 0.235 0 0 0 0 0.06
FEB
MAR
APRIL
MAY
JUN
Sub Total 0 0 0 0 0 0.235 0 0 0 0 0.06
JUL
AUG
SEP
OCT
NOV
DEC
Total 0 0 0 0 0 0.24 0 0 0 0 0.06

Notes:

Contract No. CV/2013/03 Particular Specification Appendix 1.27

Name of Department: CEDD

Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5

Forecast of Total Quantities of C&D Materials to be Generated from the Contract (see Note 4)
Total Quantity Generated Hard Rocks and Large Broken Concrete Reused in the Contract Reused in Other Projects Disposed as Public Fill Imported Fill Metal Paper / cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
0 0 0 0 0 350 30 4 2 1 4

Notes:

(1)
The performance targets are given in PS clause 6(14) above.
(2)
The waste flow table shall also include C&D materials that are specified in the Contractor to be imported for use at the Site.
(3)
Plastic refer to plastic bottles/containers, plastic sheets/foam from packaging material.
(4)
The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the nature

- Hard Rocks and Large Broken Concrete = Cannot be defined at this stage

-Imported Fill = Estimated by the Contractor = 1 loading = 8m 3

-Metal = Estimated by the Contractor

-Paper/cardboard packaging = Estimated by the Contractor

-Plastics = Estimated by the Contractor

- Chemical Waste = Estimated by the Contractor (Spent lubricating oil, assume density 0.9kg/L)

-Other, e.g. general refuse = Estimated by the Contractor

Monthly Summary Waste Flow Table for 2015 (year)

Name of Person completing the record: KM LUI (EO) Project : Liangtang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 Contract No.: CV/2013/08

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in ‘000m3) (in '000 kg) (in '000kg) (in '000kg) (in '000kg) (in ‘000 m3)
Jan
Feb
Mar
Apr
May
Jun 0 0 0 0 0 0 0 0 0 0 0
Sub-total 0 0 0 0 0 0 0 0 0 0 0
Jul 0 0 0 0 0 0 0 0 0 0 0
Aug 27.831 0 5.11 0.516 22.205 0 0 0 0 0 1.783
Sep 35.826 0 1.517 1.629 32.680 0 0 0 0 0 0.434
Oct 37.112 0 0.113 5.356 31.643 0 0 0.045 0 14.08 0.185
Nov 16.853 0 0.717 2.456 13.680 4.720 0 0.102 0 18.20 0.594
Dec 51.601 0 11.077 6.827 33.697 2.529 0 0.147 0 0 0.08
Total 169.223 0 18.534 16.784 133.905 7.249 0 0.294 0 32.28 3.076

Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.

(2)
Plastics refer to plastic bottles/containers, plastic sheets/ foam from packaging materials.
(3)
Broken concrete for recycling into aggregates.

Monthly Summary Waste Flow Table for 2016 (year)

Name of Person completing the record: KM LUI (EO) Project : Liangtang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 Contract No.: CV/2013/08

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in ‘000m3) (in '000 kg) (in '000kg) (in '000kg) (in '000kg) (in ‘000 m3)
Jan 58.943 0 3.811 12.131 43.001 43.109 0 0 0 0 0.695
Feb
Mar
Apr
May
Jun
Sub-total 58.943 0 3.811 12.131 43.001 43.109 0 0 0 0 0.695
Jul
Aug
Sep
Oct
Nov
Dec
Total 228.166 0 22.345 28.915 176.906 50.358 0 0.294 0 32.28 3.771

Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.

(2)
Plastics refer to plastic bottles/containers, plastic sheets/ foam from packaging materials.
(3)
Broken concrete for recycling into aggregates.
Architectural Services Department Form No. D/OI.03/09.002

SSC505

Contract No. / Works Order No.:

Monthly Summary Waste Flow Table for 2015 [year] [to be submitted not later than the 15th day of each month following reporting month] (All quantities shall be rounded off to 3 decimal places.)

Month Actual Quantities of Inert Construction Waste Generated Monthly
(a)=(b)+(c)+(d)+(e)Total Quantity Generated (b)Broken Concrete (see Note 4) (c)Reused in the Contract (d) Reused in other Projects (e)Disposed of as Public Fill
(in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3)
Jan - - - - -
Feb - - - - -
Mar - - - - -
Apr - - - - -
May - - - - -
Jun - - - - -
Sub-total - - - - -
Jul 0 0 0 0 0
Aug 0 0 0 0 0
Sep 0.094 0 0.094 0 0
Oct 0.382 0 0.382 0 0
Nov 0.271 0 0.128 0 0.143
Dec 0.663 0 0 0 0.663
Total 1.410 0 0.604 0 0.806

Page 1 Page 2

Architectural Services Department Form No. D/OI.03/09.002
Month Actual Quantities of Non-inert Construction Waste Generated Monthly
Timber Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Other Recyclable Materials _________________ (pls. specify) General Refuse disposed of at Landfill
(in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000m3)
generated recycled generated recycled generated recycled generated recycled generated recycled generated recycled generated
Jan - - - - - - - - - - - - -
Feb - - - - - - - - - - - - -
Mar - - - - - - - - - - - - -
Apr - - - - - - - - - - - - -
May - - - - - - - - - - - - -
Jun - - - - - - - - - - - - -
Sub-total - - - - - - - - - - - - -
Jul 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Aug 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sep 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.020
Oct 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.046
Nov 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.60 0.00 0.00 0.00 0.052
Dec 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.111
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.60 0.00 0.00 0.00 0.229
Architectural Services Department Form No. D/OI.03/09.002

SSC505

Contract No. / Works Order No.:

Monthly Summary Waste Flow Table for 2016 [year] [to be submitted not later than the 15th day of each month following reporting month] (All quantities shall be rounded off to 3 decimal places.)

Month Actual Quantities of Inert Construction Waste Generated Monthly
(a)=(b)+(c)+(d)+(e)Total Quantity Generated (b)Broken Concrete (see Note 4) (c)Reused in the Contract (d)Reused in other Projects (e)Disposed of as Public Fill
(in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3)
Jan 0.8 0 0 0 0.8
Feb - - - - -
Mar - - - - -
Apr - - - - -
May - - - - -
Jun - - - - -
Sub-total 0.8 0 0 0 0.8
Jul - - - - -
Aug - - - - -
Sep - - - - -
Oct - - - - -
Nov - - - - -
Dec - - - - -
Total 0.8 0 0 0 0.8
Architectural Services Department Form No. D/OI.03/09.002
Month Actual Quantities of Non-inert Construction Waste Generated Monthly
Timber Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Other Recyclable Materials _________________ (pls. specify) General Refuse disposed of at Landfill
(in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000m3)
generated recycled generated recycled generated recycled generated recycled generated recycled generated recycled generated
Jan 0.000 0.000 4.73 4.73 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.072
Feb - - - - - - - - - - - - -
Mar - - - - - - - - - - - - -
Apr - - - - - - - - - - - - -
May - - - - - - - - - - - - -
Jun - - - - - - - - - - - - -
Sub-total 0.000 0.000 4.73 4.73 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.072
Jul - - - - - - - - - - - - -
Aug - - - - - - - - - - - - -
Sep - - - - - - - - - - - - -
Oct - - - - - - - - - - - - -
Nov - - - - - - - - - - - - -
Dec - - - - - - - - - - -
Total 0.000 0.000 4.73 4.73 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.072
Architectural Services Department Form No. D/OI.03/09.002
Description of mode and details of recycling if any for the month e.g. XX kg of used timber was sent to YY site for transformation into fertilizers
4730 kg of scrap metal was sent to Yat Fung for transformation for reuse 0 0 0 0 0
Notes: (1) The performance targets are given in the Particular Specification on Environmental Management Plan.
(2) The waste flow table shall also include construction waste that are specified in the Contract to be imported for use at the site.
(3) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.
(4) (5) Broken concrete for recycling into aggregates. If necessary, use the conversion factor: 1 full load of dumping truck being equivalent to 6.5 m3 by volume.