Job No.: TCS00694/13

 

 

 

 

 

 

 

 

 

Agreement No. CE 45/2008 (CE)

Liantang/Heung Yuen Wai

Boundary Control Point and Associated Works

 

 

 

 

 

 

 

 

 

11th Quarterly Environmental Monitoring & Audit Summary Report ¡V

(February 2016 to April 2016)

 

 

 

 

 

Prepared For

 

 

 

 

 

Civil Engineering and Development Department (CEDD)

 

 

 

 

 

 

 

 

 

Quality Index

Date

Reference No.

Prepared By

Certified By

29 August 2016

TCS00694/13/600/R0324v2

Nicola Hon

(Environmental Consultant)

T.W. Tam

(Environmental Team Leader)

 

 

 

Version

Date

Description

1

26 July 2016

First Submission

2

29 August 2016

Amended according to the IEC¡¦s comments on 2 August 2016

 

 

 

 

 

 

This report has been prepared by Action-United Environmental Services & Consulting with all reasonable skill, care and diligence within the terms of the Agreement with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies upon the report at their own risk.

 


 

 

 

 

 

 

Executive Summary

ES.01.   This is the 11th Quarterly EM&A Summary Report for the ¡§Liantang/Heung Yuen Wai Boundary Control Point and Associated Works¡¨ under Environmental Permit No. EP-404/2011/C (hereinafter ¡¥¡¥the EP¡¦¡¦), covering the period from 1 February 2016 to 30 April 2016 (hereinafter ¡§Reporting Period¡¨).

 

Environmental Monitoring and Audit Activities

ES.02.   In the Reporting Period, the construction works under Liantang/Heung Yuen Wai Boundary Control Point and Associated Works of the Project currently included Contract 2, Contract 3, Contract 5, Contract 6 and Contract SS C505.  In addition, construction work for Contract 7 has been commenced on 15 February 2016.  Environmental monitoring activities under the EM&A programme in the Reporting Period are summarized in the following table.

 

Environmental Aspect

Monitoring Parameters / Inspection

Reporting Period

Monitoring Locations / Contracts

Total Occasions  

Air Quality

1-hour TSP

9

456

24-hour TSP

9

150

Construction Noise

Leq(30min) Daytime

10

150

Water Quality

Water in-situ measurement and/or sampling

WM1 & WM1-C,

37 scheduled and 7 extra of sampling days

WM2A & WM2A-C

37 scheduled and 4 extra of sampling days

WM2B & WM2B-C

37 scheduled and 18 extra of sampling days

WM3 &WM3-C

37 scheduled and 6 extra of sampling days

WM4, WM4-CA &WM4-CB

37 scheduled and 2 extra of sampling days

Joint Site Inspection / Audit

IEC, ET, the Contractor and RE joint site Environmental Inspection and Auditing

Contract 2

13

Contract 3

12

Contract 5

13

Contract 6

13

Contract 7

11

Contract SS C505

13

Note: Extra monitoring day was due to measurement results exceedance

 

Breaches of Action/Limit levels

ES.03.   In the Reporting Period, no air quality exceedance was registered for the Project.  For construction noise, one (1) noise complaint was received by 1823 for Contract 3 on 18 February 2016 which triggered the Action Level (AL).  Moreover, total ninety-two (92) of Action/ Limit Level exceedance were recorded for water quality monitoring which included turbidity and Suspended Solids.  The summary of breach of environmental performance is shown below.

 

Environmental Aspect

Monitoring Parameters

Action Level

Limit Level

Event & Action

NOE Issued

Investigation

Corrective Actions

Air Quality

1-hour TSP

0

0

0

--

--

24-hour TSP

0

0

0

--

--

Construction Noise

Leq(30min) Daytime

1

0

1

The noise complaint was not project related.

N/A

Water Quality

DO

0

0

0

--

--

Turbidity

0

48

48

Total 16 exceedance is the Project related but 32 exceedance were not due to the Project construction activities

The relevant Contractors including C2 and C6 shall implemented water quality mitigation measures in accordance with ISEMM of the EM&A Manual requirements

SS

1

43

44

Total 12 exceedance is the Project related but 32 exceedance were not due to the Project construction activities

 

Environmental Complaint

ES.04.   In this Reporting Period, nine (9) documented environmental complaints were received and lodged.  Follow up actions have been undertaking by the Contractor to resolve the deficiencies. The investigation reports conducted by the ET were all completed and submitted to all relevant parties.  In brief, all complaints were unlikely due to the project.  However, the Contractor was reminded to fully implement the recommended mitigation measures as per the EM&A Manual.

 

Notification of Summons and Successful Prosecutions

ES.05.   No environmental summons or successful prosecutions were recorded in the Reporting Period.  

 

Reporting Changes

ES.06.   EPD has approved the revised EM&A Programme on 29th March 2016. If the measured water depth of the monitoring station is lower than 150 mm, alternative location based on the criteria will be selected to perform water monitoring in accordance with the updated EM&A Programme (Rev. 05) (Section 4.1.4)

 

Future key issues

ES.07.   In upcoming wet season, preventive measures for muddy water or other water pollutants from site surface flow to local stream such as Kong Yiu Channel, Ma Wat Channel, Ping Yuen River or public area would be the key issue.  The Contractors should paid special attention on water quality mitigation measures and fully implement according ISEMM of the EM&A Manual, in particular for working areas near Ma Wat Channel and Ping Yuen River.  Moreover, all effluent discharge shall be ensure to fulfill Technical Memorandum of Effluent Discharged into Drainage and Sewerage Systems, inland and Coastal Waters criteria or discharge permits stipulation.

 

ES.08.   Construction noise would be a key environmental issue during construction work of the Project.  Noise mitigation measures such as using quiet plants should be implemented in accordance with the EM&A requirement.

 

ES.09.   Since most of construction sites under the Project are located adjacent to villages, the Contractors should fully implement air quality mitigation measures to reduce construction dust emission.

 

 


Table of Contents

1       Introduction   1

1.1          Project Background   1

1.2          Report Structure  1

2       Project Organization and Construction progress  2

2.1          Construction Contract Packaging   2

2.2          Project Organization   4

2.3          Concurrent Projects  6

2.4          Construction Progress  6

2.5          Summary of Environmental Submissions  8

3       Project Organization and Construction progress  13

3.1          General  13

3.2          Monitoring Parameters  13

3.3          Monitoring Locations  13

3.4          Monitoring Frequency and Period   15

3.5          Monitoring Equipment  16

3.6          Monitoring Methodology   18

3.7          Equipment Calibration   20

3.8          Derivation of Action/Limit (A/L) Levels  20

3.9          Data Management and Data QA/QC Control  21

4       Air Quality Monitoring   22

4.1          General  22

4.2          Summary of Monitoring Results  22

5       Construction Noise Monitoring   24

5.1          General  24

5.2          Summary of Monitoring Results  24

6       Water Quality Monitoring   26

6.1          General  26

6.2          Summary of Monitoring Results  26

7       Waste Management   31

7.1          General Waste Management  31

7.2          Records of Waste Quantities  31

8       Site Inspections  33

8.1          requirements  33

9       Non-compliance, Complaints, Notifications of Summons and Prosecutions  36

9.1          Status of Non-compliance Environmental Complaint, Summons and Prosecution   36

10     Implementation Status of Mitigation Measures  40

10.1        General Requirements  40

11     Conclusions and Recommendations  41

11.1        Conclusions  41

11.2        Recommendations  41

 


List of tables

Table 2-1      Status of Environmental Licenses and Permits of the Contracts

Table 3-1      Summary of EM&A Requirements

Table 3-2      Impact Monitoring Stations - Air Quality

Table 3-3      Impact Monitoring Stations - Construction Noise

Table 3-4      Impact Monitoring Stations - Water Quality

Table 3-5      Air Quality Monitoring Equipment

Table 3-6      Construction Noise Monitoring Equipment

Table 3-7      Water Quality Monitoring Equipment

Table 3-8      Action and Limit Levels for Air Quality Monitoring

Table 3-9      Action and Limit Levels for Construction Noise

Table 3-10    Action and Limit Levels for Water Quality

Table 4-1     Summary of Air Quality Monitoring Results

Table 4-2      Summaries of Breaches of Air Quality A/L Levels

Table 5-1     Summary of Construction Noise Monitoring Results

Table 5-2      Summaries of Breaches of Construction Noise A/L Levels

Table 6-1      Summary of the Water Quality Monitoring Results ¡V Contract 5

Table 6-2      Summary of the Water Quality Monitoring Results ¡V Contract 2 & 3

Table 6-3      Summary of the Water Quality Monitoring Results ¡V Contract 6

Table 6-4      Summary of the Water Quality Monitoring Results ¡V Contract 2 & 6

Table 6-5      Summaries of Breaches of the Existing Water Quality A/L Levels

Table 6-6      Summary of Water Quality Exceedance in the Reporting Period

Table 7-1      Summary of Quantities of Inert C&D Materials

Table 7-2      Summary of Quantities of C&D Wastes

Table 8-1      Summary of Reminders/Observations of Site Inspection ¡V Contract 2

Table 8-2      Summary of Reminders/Observations of Site Inspection ¡V Contract 3

Table 8-3      Summary of Reminders/Observations of Site Inspection ¡V Contract 5

Table 8-4      Summary of Reminders/Observations of Site Inspection ¡V Contract 6

Table 8-5      Summary of Reminders/Observations of Site Inspection ¡V Contract SS C505

Table 8-6      Summary of Reminders/Observations of Site Inspection ¡V Contract 7

Table 9-1      Statistical Summary of Environmental Complaints

Table 9-2      Statistical Summary of Environmental Summons

Table 9-3      Statistical Summary of Environmental Prosecution

Table 10-1    Environmental Mitigation Measures

 

List of Annexes

Appendix A  Layout plan of the Project

Appendix B  Environmental Management Organization Chart

Appendix C  Designated Monitoring Locations as Recommended in the Approved EM&A Manual

Appendix D  Monitoring Locations for Impact Monitoring

Appendix E  Event and Action Plan

Appendix F  Graphical Plots for Monitoring Result

Appendix G  Weather information

Appendix H  Waste Flow Table

Appendix I   Implementation Schedule for Environmental Mitigation Measures

 

 

 

 


1                    Introduction

1.1              Project Background

1.1.1.      Civil Engineering and Development Department is the Project Proponent and the Permit Holder of Agreement No. CE 45/2008 (CE) Liantang / Heung Yuen Wai Boundary Control Point and Associated Works, which is a Designated Project to be implemented under Environmental Permit number EP-404/2011/C granted on 12 March 2015. 

 

1.1.2.      The Project consists of two main components: Construction of a Boundary Control Point (hereinafter referred as ¡§BCP¡¨); and Construction of a connecting road alignment.  Layout plan of the Project is shown in Appendix A.

 

1.1.3.      The proposed BCP is located at the boundary with Shenzhen near the existing Chuk Yuen Village, comprising a main passenger building with passenger and cargo processing facilities and the associated customs, transport and ancillary facilities.  The connecting road alignment consists of six main sections:

1)             Lin Ma Hang to Frontier Closed Area (FCA) Boundary ¡V this section comprises at-grade and viaducts and includes the improvement works at Lin Ma Hang Road;

2)             Ping Yeung to Wo Keng Shan ¡V this section stretches from the Frontier Closed Area Boundary to the tunnel portal at Cheung Shan and comprises at-grade and viaducts including an interchange at Ping Yeung;

3)             North Tunnel ¡V this section comprises the tunnel segment at Cheung Shan and includes a ventilation building at the portals on either end of the tunnel;

4)             Sha Tau Kok Road ¡V this section stretches from the tunnel portal at Wo Keng Shan to the tunnel portal south of Loi Tung and comprises at-grade and viaducts including an interchange at Sha Tau Kok and an administration building;

5)             South Tunnel ¡V this section comprises a tunnel segment that stretches from Loi Tung to Fanling and includes a ventilation building at the portals on either end of the tunnel as well as a ventilation building in the middle of the tunnel near Lau Shui Heung;

6)             Fanling ¡V this section comprises the at-grade, viaducts and interchange connection to the existing Fanling Highway.

 

1.1.4.      Action-United Environmental Services & Consulting has been commissioned as an Independent ET to implement the relevant EM&A program in accordance with the approved EM&A Manual, as well as the associated duties. 

 

1.1.5.      This is the 11th Quarterly EM&A Summary Report for the ¡§Liantang/Heung Yuen Wai Boundary Control Point and Associated Works¡¨ under Environmental Permit No. EP-404/2011/C, covering the period from 1 February 2016 to 30 April 2016.

 

1.2              Report Structure

1.2.1        The Quarterly Environmental Monitoring and Audit (EM&A) Summary Report is structured into the following sections:-

Section 1       Introduction

Section 2       Project Organization and Construction progress

Section 3       Summary of Impact monitoring Requirements

Section 4       Air Quality Monitoring

Section 5       Construction Noise Monitoring

Section 6       Water Quality Monitoring

Section 7       Waste Management

Section 8       Non-compliance, Complaints, Notifications of Summons and Prosecutions

Section 9       Implementation Status of Mitigation Measures

Section 10     Conclusions and Recommendations

 

 

 


2                    Project Organization and Construction progress

2.1              Construction Contract Packaging

2.1.1        To facilitate the project management and implementation, the Project would be divided by the following contracts:

¡P                Contract 2 (CV/2012/08)

¡P                Contract 3 (CV/2012/09)

¡P                Contract 4 (NE/2014/02)

¡P                Contract 5 (CV/2013/03)

¡P                Contract 6 (CV/2013/08)

¡P                Contract 7 (NE/2014/03)

¡P                ArchSD Contract No. SS C505

 

2.1.2        The details of each contracts is summarized below and the delineation of each contracts is shown in Appendix A.

 

Contract 2 (CV/2012/08)

2.1.3        Contract 2 has awarded in December 2013 and construction work was commenced on 19 May 2014.  Major Scope of Work of the Contract 2 is listed below:

¡P           construction of an approximately 5.2km long dual two-lane connecting road (with about 0.4km of at-grade road and 4.8km of tunnel) connecting the Fanling Interchange with the proposed Sha Tau Kok Interchange;

¡P           construction of a ventilation adit tunnel and the mid-ventilation building;

¡P           construction of the north and south portal buildings of the Lung Shan Tunnel and their associated slope works;

¡P           provision and installation of ventilation system, E&M works and building services works for Lung Shan tunnel and Cheung Shan tunnel and their portal buildings;

¡P           construction of Tunnel Administration Building adjacent to Wo Keng Shan Road and the associated E&M and building services works; and

¡P           construction of associated footpath, slopes, retaining structures, drainage, sewerage, waterworks, landscaping works and other ancillary works.

 

Contract 3 (CV/2012/09)

2.1.4        Contract 3 was awarded in July 2013 and construction work was commenced on 5 November 2013.  Major Scope of Work of the Contract 3 is listed below:

¡P           construction of four link roads connecting the existing Fanling Highway and the south portal of the Lung Shan Tunnel;

¡P           realignment of the existing Tai Wo Service Road West and Tai Wo Service Road East;

¡P           widening of the existing Fanling Highway (HyD¡¦s entrustment works);

¡P           demolishing existing Kiu Tau vehicular bridge and Kiu Tau footbridge and reconstruction of the existing Kiu Tau Footbridge (HyD¡¦s entrustment works); and

¡P           construction of associated footpath, slopes, retaining structures, drainage, sewerage, waterworks, landscaping works and other ancillary works.

 

Contract 4 (NE/2014/02)