Name of Department : CEDD Contract No./ Work Order No. : CV/2012/08
(All quantities shall be rounded off to 3 decimal places)
Month | Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) | Actual Quantities of Other C&D Materials / Wastes Generated | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantities Generated [a+b+c+d) | Broken Concrete (including rock for recycling into aggregates) (a) | Reused in the Contract (b) | Reused in Other Projects (c) | Disposed as Public Fill (d) | Imported C&D Material | Metal (in '000kg) | Paper/ Cardboard Packaging (in '000kg) | Plastic (Recycled) (in '000kg) | Chemical Waste (in '000kg) | Others (e.g. General Refuse etc.) (in '000 m3) (in '000m3) | |
January | 72.9008 | 0.0000 | 2.0045 | 31.5900 | 39.3063 | 9.1064 | 0.1440 | 0.3600 | 1.9179 | 1.7600 | 0.3210 |
February | 85.5922 | 0.0000 | 1.4413 | 29.9165 | 54.2343 | 8.4347 | 0.0769 | 0.3000 | 2.1663 | 4.3480 | 0.3365 |
March | 36.8512 | 0.0000 | 0.5903 | 33.0669 | 3.1940 | 7.7980 | 0.3892 | 0.4000 | 1.3527 | 4.0720 | 0.4167 |
April | 41.5646 | 0.0000 | 1.2335 | 33.1649 | 7.1663 | 7.9084 | 0.4200 | 0.3200 | 2.0268 | 13.0254 | 0.3862 |
May | 34.0768 | 0.0000 | 0.4115 | 29.0822 | 4.5830 | 8.3119 | 0.4765 | 0.3700 | 2.7135 | 3.5440 | 0.3907 |
June | 38.4359 | 0.0000 | 0.6721 | 13.5900 | 24.1738 | 8.0061 | 0.0917 | 0.3300 | 3.3687 | 4.8760 | 0.3265 |
Half-year total | 309.4216 | 0.0000 | 6.3533 | 170.4106 | 132.6577 | 49.5655 | 1.5983 | 2.0800 | 13.5459 | 31.6254 | 2.1777 |
July | 85.5801 | 0.0000 | 1.2343 | 2.8380 | 81.5079 | 8.2250 | 0.0802 | 0.3200 | 3.1617 | 1.5080 | 0.5330 |
August | 73.2350 | 0.0000 | 0.3805 | 0.8032 | 72.0514 | 8.4800 | 0.0311 | 0.3500 | 4.0788 | 2.8400 | 0.5071 |
September | 69.9895 | 0.0000 | 0.0705 | 1.4936 | 68.4254 | 7.1930 | 0.0423 | 0.3400 | 2.1170 | 1.1560 | 0.5672 |
October | 77.6273 | 0.0000 | 0.0000 | 0.0000 | 77.6273 | 0.2297 | 0.0280 | 0.3000 | 2.2253 | 8.9592 | 0.6288 |
November | 0.0000 | ||||||||||
December | 0.0000 | ||||||||||
Yearly Total | 615.8535 | 0.0000 | 8.0385 | 175.5453 | 432.2696 | 73.6932 | 1.7799 | 3.3900 | 25.1287 | 46.0886 | 4.4137 |
(All quantities shall be rounded off to 3 decimal places)
Year | D Materials Generated / Imported (in '000 m3) | Actual Quantities of Other C&D Materials / Wastes Generated | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantities Generated [a+b+c+d) | Broken Concrete (including rock for recycling into aggregates) (a) | Reused in the Contract (b) | Reused in Other Projects (c) | Disposed as Public Fill (d) | Imported C&D Material | Metal (in '000kg) | Paper/ Cardboard Packaging (in '000kg) | Plastic (Recycled) (in '000kg) | Chemical Waste (in '000kg) | Others (e.g. General Refuse etc.) (in '000 m3) (in '000m3) | |
2013 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 |
2014 | 425.4406 | 0.0000 | 2.7362 | 376.3945 | 46.3099 | 5.6245 | 3.2100 | 0.4390 | 0.0070 | 10.8800 | 2.2609 |
2015 | 570.9459 | 0.0000 | 20.8159 | 543.2162 | 6.9138 | 4.5492 | 14.1300 | 3.9220 | 11.9700 | 16.1920 | 1.1696 |
2016 | 905.0989 | 0.0000 | 7.4372 | 427.7834 | 469.8783 | 24.8350 | 259.2290 | 3.8500 | 18.7262 | 34.2936 | 1.9720 |
2017 | 615.8535 | 0.0000 | 8.0385 | 175.5453 | 432.2696 | 73.6932 | 1.7799 | 3.3900 | 25.1287 | 46.0886 | 4.4137 |
2018 | |||||||||||
Total | 2517.3389 | 0.0000 | 39.0278 | 1522.9395 | 955.3716 | 108.7019 | 278.3489 | 11.6010 | 55.8319 | 107.4542 | 9.8162 |
Remark: | |||||
---|---|---|---|---|---|
1) Density of C&D material to be | 2.2 | metric ton/m3 | 3) Density of Spent Oil to be | 0.88 | metric ton/m3 |
2) Density of General Refuse to be | 1.6 | metric ton/m3 |
Name of Department: CEDD Contract No.: CV/2012/09
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in m3) | (in '000m3) | |
Jan | 1.150 | 0.204 | 0.150 | 0.000 | 0.796 | 1.150 | 0.000 | 0.000 | 0.001 | 0.000 | 0.170 |
Feb | 1.160 | 0.308 | 0.192 | 0.000 | 0.660 | 0.926 | 0.000 | 0.000 | 0.001 | 0.000 | 0.140 |
Mar | 2.287 | 0.565 | 0.060 | 0.000 | 1.662 | 1.055 | 0.000 | 0.000 | 0.000 | 0.000 | 0.115 |
Apr | 1.004 | 0.064 | 0.036 | 0.000 | 0.903 | 0.463 | 0.000 | 0.000 | 0.004 | 0.000 | 0.075 |
May | 0.497 | 0.005 | 0.120 | 0.000 | 0.372 | 0.050 | 0.767 | 0.000 | 0.000 | 0.000 | 0.105 |
Jun | 1.249 | 0.150 | 0.150 | 0.000 | 0.948 | 0.008 | 0.000 | 0.000 | 0.000 | 0.000 | 0.135 |
Sub-total | 7.347 | 1.297 | 0.708 | 0.000 | 5.342 | 3.651 | 0.767 | 0.000 | 0.006 | 0.000 | 0.740 |
Jul | 1.917 | 0.180 | 0.120 | 0.000 | 1.617 | 0.542 | 0.000 | 0.000 | 0.000 | 0.000 | 0.065 |
Aug | 1.297 | 0.118 | 0.120 | 0.000 | 1.059 | 0.099 | 0.000 | 0.000 | 0.000 | 0.000 | 0.130 |
Sep | 2.448 | 0.437 | 0.090 | 0.000 | 1.921 | 0.291 | 0.000 | 0.000 | 0.000 | 0.000 | 0.115 |
Oct | 2.156 | 0.544 | 0.240 | 0.000 | 1.372 | 0.939 | 0.000 | 0.000 | 0.000 | 0.000 | 0.090 |
Nov | |||||||||||
Dec | |||||||||||
Total | 15.165 | 2.576 | 1.278 | 0.000 | 11.311 | 5.522 | 0.767 | 0.000 | 0.006 | 0.000 | 1.140 |
Note: 1. Assume the density of soil fill is 2 ton/m3 .
Appendix A | ||||
---|---|---|---|---|
Name of Department: | CEDD | Contract No.: NE/2014/02 | ||
Monthly Summary Waste Flow Table for 2017 |
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000 kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) | |
2016 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Jan-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Feb-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Mar-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Apr-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
May-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Jun-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Jul-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Aug-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Sep-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Oct-17 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Nov-17 | |||||||||||
Dec-17 | |||||||||||
Total | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 |
Forecast of Total Quantities of C&D Materials to be Generated from the Contract* | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000 kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) |
0.500 | 0.000 | 0.000 | 0.000 | 0.500 | 0.000 | 0.500 | 0.200 | 0.000 | 0.000 | 0.200 |
Notes :
Name of Person completing the record: K.M. Lui (EO) Project : Liangtang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 Contract No.: CV/2013/08
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in ‘000m3) | (in '000 kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in ‘000 m3) | |
Jan | 40.128 | 0 | 19.297 | 6.067 | 14.764 | 0 | 0 | 0.171 | 0 | 0 | 0.065 |
Feb | 48.065 | 0 | 16.328 | 7.123 | 24.614 | 0 | 0 | 0.294 | 0 | 0 | 0.107 |
Mar | 49.230 | 0 | 5.661 | 15.029 | 28.540 | 0 | 0 | 0.494 | 0 | 0 | 0.217 |
Apr | 52.348 | 0 | 10.824 | 31.732 | 9.792 | 0 | 0 | 0.331 | 0 | 0.290 | 0.162 |
May | 47.339 | 0 | 24.850 | 12.383 | 10.106 | 0 | 0 | 0 | 0 | 0 | 0.228 |
Jun | 1.108 | 0 | 0 | 0 | 1.108 | 0 | 0 | 0.285 | 0 | 0 | 0.258 |
Sub-total | 238.218 | 0 | 76.960 | 72.334 | 88.92418 | 0 | 0 | 1.575 | 0 | 0.29 | 1.037 |
Jul | 0.934 | 0 | 0 | 0 | 0.934 | 0 | 0 | 0.360 | 0 | 0 | 0.288 |
Aug | 1.656 | 0 | 0.432 | 0 | 1.224 | 0 | 0 | 0.291 | 0 | 0 | 0.510 |
Sep | 4.210 | 0 | 1.386 | 0 | 2.824 | 0 | 0 | 0.339 | 0 | 0 | 0.513 |
Oct | 0.970 | 0 | 0.520 | 0 | 0.450 | 0 | 0 | 0 | 0 | 0 | 0.515 |
Nov | |||||||||||
Dec | |||||||||||
Total | 989.150 | 0 | 162.989 | 270.626 | 555.53555 | 53.939 | 0 | 5.338 | 0.007 | 34.045 | 7.715 |
Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.
MONTHLY SUMMARY WASTE FLOW TABLE
Name of Department: | CEDD | |||
---|---|---|---|---|
Contract Title: | Liantang/ Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 7 | Contract No.: | NE/2014/03 | |
Monthly Summary Waste Flow Table for | 2017 (year) |
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of Non-Inert C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Contract Reused in the | Reused in other Projects | Public Fill Disposed as | Imported Fill | Metals | Paper/cardboard packaging | Plastic (see Note 3) | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) | |
Jan | 0 | 0 | 0 | 0 | 0 | 0 | 0.1 | 0.05 | 0.001 | 0 | 0.01 |
Feb | 0 | 0 | 0 | 0 | 0 | 0 | 0.5 | 0.04 | 0.001 | 0 | 0.015 |
Mar | 0.822 | 0 | 0 | 0 | 0.822 | 0 | 2.2 | 0.04 | 0.001 | 0 | 0.025 |
Apr | 1.473 | 0 | 0 | 0 | 1.473 | 0 | 3.1 | 0.04 | 0.001 | 0 | 0.02 |
May | 1.129 | 0 | 0 | 0 | 1.129 | 0 | 4.5 | 0.04 | 0.001 | 0 | 0.03 |
June | 0.317 | 0 | 0 | 0 | 0.317 | 0 | 4 | 0.04 | 0.001 | 0 | 0.04 |
Sub-total | 3.741 | 0 | 0 | 0 | 3.741 | 0 | 14.4 | 0.25 | 0.006 | 0 | 0.14 |
July | 0.931 | 0 | 0 | 0 | 0.931 | 0 | 2 | 0.04 | 0.001 | 0 | 0.025 |
Aug | 0 | 0 | 0 | 0 | 0 | 0 | 2.5 | 0.04 | 0.001 | 0 | 0.01 |
Sept | 0.068 | 0 | 0 | 0 | 0.068 | 0 | 2 | 0.04 | 0.001 | 0 | 0.01 |
Oct | 0.381 | 0 | 0 | 0 | 0.381 | 0 | 11.7 | 0.04 | 0.001 | 0 | 0.008 |
Nov | |||||||||||
Dec | |||||||||||
Total | 5.12128 | 0 | 0 | 0 | 5.12128 | 0 | 32.6 | 0.41 | 0.01 | 0 | 0.1927 |
Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.
(2) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
SSC505
Monthly Summary Waste Flow Table for 2017 [year] [to be submitted not later than the 15th day of each month following reporting month] (All quantities shall be rounded off to 3 decimal places.)
Month | Actual Quantities of Inert Construction Waste Generated Monthly | ||||
---|---|---|---|---|---|
(a)=(b)+(c)+(d)+(e) Total Quantity Generated | (b) Broken Concrete (see Note 4) | (c) Reused in the Contract | (d) Reused in other Projects | (e) Disposed of as Public Fill | |
(in ‘000m3) | (in ‘000m3) | (in ‘000m3) | (in ‘000m3) | (in ‘000m3) | |
Jan | 3.160 | 0.000 | 2.003 | 0.000 | 1.157 |
Feb | 1.374 | 0.000 | 0.249 | 0.000 | 1.125 |
Mar | 0.548 | 0.000 | 0.054 | 0.000 | 0.494 |
Apr | 4.136 | 0.013 | 1.139 | 0.000 | 2.984 |
May | 4.201 | 0.000 | 1.191 | 0.000 | 3.010 |
Jun | 9.813 | 0.000 | 1.317 | 0.000 | 8.496 |
Sub-total | 23.230 | 0.013 | 5.953 | 0.000 | 17.264 |
Jul | 9.101 | 0.000 | 1.223 | 0.000 | 7.878 |
Aug | 6.341 | 0.000 | 2.532 | 0.000 | 3.809 |
Sep | 5.142 | 0.000 | 4.992 | 0.000 | 0.150 |
Oct | 2.610 | 0.000 | 0.250 | 0.000 | 2.360 |
Nov | - | - | - | - | - |
Dec | - | - | - | - | - |
Total | 46.423 | 0.013 | 14.950 | 0.000 | 31.460 |
Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011
Page 1
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
Month | Actual Quantities of Non-inert Construction Waste Generated Monthly | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Timber | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Other Recyclable Materials (see Page 3) | General Refuse disposed of at Landfill | |||||||
(in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000m3) | |||||||
generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | |
Jan | 0.000 | 0.000 | 458.150 | 458.150 | 0.560 | 0.560 | 0.058 | 0.058 | 0.000 | 0.000 | 0.024 | 0.024 | 0.481 |
Feb | 0.000 | 0.000 | 177.180 | 177.180 | 0.370 | 0.370 | 0.036 | 0.036 | 0.000 | 0.000 | 0.008 | 0.008 | 0.280 |
Mar | 0.000 | 0.000 | 97.370 | 97.370 | 3.380 | 3.380 | 1.573 | 1.573 | 0.000 | 0.000 | 0.036 | 0.036 | 0.423 |
Apr | 0.000 | 0.000 | 148.110 | 148.110 | 0.300 | 0.300 | 1.223 | 1.223 | 0.000 | 0.000 | 29.795 | 29.795 | 0.358 |
May | 0.000 | 0.000 | 405.500 | 405.500 | 0.440 | 0.440 | 0.040 | 0.040 | 0.000 | 0.000 | 0.006 | 0.006 | 0.644 |
Jun | 0.000 | 0.000 | 338.580 | 338.580 | 0.710 | 0.710 | 0.036 | 0.036 | 0.000 | 0.000 | 0.002 | 0.002 | 0.878 |
Sub-total | 0.000 | 0.000 | 1624.890 | 1624.890 | 5.020 | 5.020 | 2.926 | 2.926 | 0.000 | 0.000 | 29.871 | 29.871 | 3.062 |
Jul | 0.000 | 0.000 | 296.540 | 296.540 | 0.650 | 0.650 | 1.040 | 1.040 | 0.000 | 0.000 | 0.002 | 0.002 | 1.651 |
Aug | 0.000 | 0.000 | 239.720 | 239.720 | 0.700 | 0.700 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 1.554 |
Sep | 0.000 | 0.000 | 68.060 | 68.060 | 0.570 | 0.570 | 1.037 | 1.037 | 0.000 | 0.000 | 0.001 | 0.001 | 1.606 |
Oct | 0.000 | 0.000 | 53.130 | 53.130 | 0.000 | 0.000 | 3.000 | 3.000 | 0.000 | 0.000 | 0.000 | 0.000 | 1.651 |
Nov | - | - | - | - | - | - | - | - | - | - | - | - | - |
Dec | - | - | - | - | - | - | - | - | - | - | - | - | - |
Total | 0.000 | 0.000 | 2282.340 | 2282.340 | 6.940 | 6.940 | 8.003 | 8.003 | 0.000 | 0.000 | 29.873 | 29.873 | 9.523 |
Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011
Page 2
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
Description of mode and details of recycling if any for the month e.g. XX kg of used timber was sent to YY site for transformation into fertilizers | |||||
---|---|---|---|---|---|
3000kg of plastic barrier were sent to Forest Hill for recycling. | 53.13 tons of scrap metals from LCAL were sent to Hop Hing Metal Works and Wai Hung for recycling |
Notes: | (1) | The performance targets are given in the Particular Specification on Environmental Management Plan. |
(2) | The waste flow table shall also include construction waste that are specified in the Contract to be imported for use at the site. | |
(3) | Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material. | |
(4) | Broken concrete for recycling into aggregates. | |
(5) | If necessary, use the conversion factor: 1 full load of dumping truck being equivalent to 6.5 m3 by volume. |