Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

24-hour TSP Monitoring Data

DATE SAMPLE NUMBE R ELAPSED TIME CHART READING AVG TEMP AVG AIR PRESS STANDARD FLOW RATE AIR VOLUME FILTER WEIGHT (g) DUST WEIGHT COLLECTED 24-HR TSP (μg/m3)
INITIAL FINAL (min) MIN MAX AVG () (hPa) (m3/min) (std m3) INITIAL FINAL (g)
AM1a - Garden Farm, Tsung Yuen Ha Village
6-Oct-15 28474 10573.10 10596.74 1418.40 35 35 35.0 26 1014.1 1.23 1746 2.8452 2.8938 0.0486 28
12-Oct-15 28539 10596.74 10620.58 1430.40 35 36 35.5 23.1 1019 1.25 1791 2.7399 2.8827 0.1428 80
17-Oct-15 28543 10620.58 10644.87 1457.40 40 43 41.5 25.6 1014.2 1.41 2062 2.7597 3.0009 0.2412 117
23-Oct-15 28576 10644.87 10668.85 1438.80 34 34 34.0 24.7 1013 1.20 1733 2.7883 2.9331 0.1448 84
29-Oct-15 28474 10668.85 10692.44 1415.40 29 30 29.5 26.4 1018.2 1.05 1488 2.7902 2.8669 0.0767 52
AM2 - Village House near Lin Ma Hang Road
6-Oct-15 28473 6118.89 6142.72 1429.80 30 31 30.5 26 1014.1 0.96 1371 2.8432 2.8907 0.0475 35
12-Oct-15 28540 6142.72 6167.20 1468.80 32 33 32.5 23.1 1019 1.04 1520 2.7503 2.9694 0.2191 144
17-Oct-15 28561 6167.20 6190.99 1427.40 33 34 33.5 25.6 1014.2 1.06 1516 2.8003 3.0160 0.2157 142
23-Oct-15 28566 6190.99 6214.78 1427.40 32 33 32.5 24.7 1013 1.03 1469 2.8143 3.0099 0.1956 133
29-Oct-15 28675 6214.78 6238.61 1429.80 32 33 32.5 26.4 1018.2 1.03 1477 2.7910 2.9228 0.1318 89
AM3 - Ta Kwu Ling Fire Service Station of Ta Kwu Ling Village
6-Oct-15 28460 7230.65 7254.65 1440.00 32 33 32.5 26 1014.1 0.98 1404 2.8093 2.8242 0.0149 11
12-Oct-15 28541 7254.70 7278.70 1440.00 42 42 42.0 23.1 1019 1.31 1890 2.7660 3.0112 0.2452 130
17-Oct-15 28562 7278.72 7302.72 1440.00 33 36 34.5 25.6 1014.2 1.04 1504 2.7943 2.8208 0.0265 18
23-Oct-15 28577 7302.74 7326.74 1440.00 42 42 42.0 24.7 1013 1.30 1878 2.8088 3.0222 0.2134 114
29-Oct-15 28676 7326.74 7350.74 1440.00 31 32 31.5 26.4 1018.2 0.94 1356 2.7670 2.7801 0.0131 10
AM4 - House no. 10B1 Nga Yiu Ha Village
27-Oct-15 28596 9306.65 9330.65 1440.00 38 39 38.5 26.5 1015.6 0.99 1432 2.7993 2.9191 0.1198 84
AM5a - Ping Yeung Village House
27-Oct-15 28597 7144.93 7168.92 1439.40 34 35 34.5 26.5 1015.6 1.04 1497 2.8021 2.9110 0.1089 73
AM6 - Wo Keng Shan Village House
27-Oct-15 28594 5692.43 5716.43 1440.00 33 34 33.5 26.5 1015.6 1.05 1513 2.7811 2.9292 0.1481 98
AM7b - Loi Tung Village House
6-Oct-15 28510 14652.96 14676.96 1440.00 44 45 44.5 26 1014.1 1.30 1870 2.7976 2.8503 0.0527 28
12-Oct-15 28538 14676.97 14700.98 1440.60 48 48 48.0 23.1 1019 1.40 2023 2.7573 2.8852 0.1279 63
17-Oct-15 28565 14700.98 14724.98 1440.00 48 49 48.5 25.6 1014.2 1.41 2029 2.8050 2.9546 0.1496 74
23-Oct-15 28598 14724.98 14748.98 1440.00 48 49 48.5 24.7 1013 1.41 2031 2.8017 2.9519 0.1502 74
29-Oct-15 28679 14748.98 14772.98 1440.00 32 32 32.0 26.4 1018.2 0.96 1382 2.7895 2.8704 0.0809 59
AM8 - Po Kat Tsai Village No. 4
6-Oct-15 28511 8523.37 8547.35 1438.80 48 48 48.0 26 1014.1 1.32 1896 2.7979 2.8427 0.0448 24
12-Oct-15 28542 8547.35 8571.35 1440.00 48 48 48.0 23.1 1019 1.33 1912 2.7560 2.8323 0.0763 40
17-Oct-15 28575 8571.38 8595.38 1440.00 43 44 43.5 25.6 1014.2 1.19 1712 2.7763 2.8989 0.1226 72

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

DATE SAMPLE NUMBE R ELAPSED TIME CHART READING AVG TEMP AVG AIR PRESS STANDARD FLOW RATE AIR VOLUME FILTER WEIGHT (g) DUST WEIGHT COLLECTED 24-HR TSP (μg/m3)
INITIAL FINAL (min) MIN MAX AVG () (hPa) (m3/min) (std m3) INITIAL FINAL (g)
23-Oct-15 28592 8595.38 8619.38 1440.00 48 49 48.5 24.7 1013 1.33 1921 2.7875 2.9314 0.1439 75
29-Oct-15 28678 8619.38 8643.38 1440.00 48 48 48.0 26.4 1018.2 1.31 1882 2.7950 2.8728 0.0778 41
AM9b - Nam Wa Po Village House No. 80
6-Oct-15 power failure
12-Oct-15 28542 16024.10 16048.10 1440.00 32 32 32.0 23.1 1019 1.05 1515 2.7694 2.8266 0.0572 38
17-Oct-15 28477 16048.12 16072.12 1440.00 33 34 33.5 25.6 1014.2 1.09 1573 2.8617 3.0548 0.1931 123
23-Oct-15 28593 16072.13 16096.13 1440.00 33 34 33.5 24.7 1013 1.09 1575 2.7854 3.0167 0.2313 147
29-Oct-15 28677 16096.13 16120.13 1440.00 34 34 34.0 26.4 1018.2 1.12 1610 2.7898 2.9272 0.1374 85

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Construction Noise Monitoring Results, dB(A)

Date Start Time 1st Leq5mi n L10 L90 2nd Leq5mi n L10 L90 3nd Leq5mi n L10 L90 4th Leq5mi n L10 L90 5th Leq5mi n L10 L90 6th Leq5mi n L10 L90 Leq30 façade correctio n
NM1 - Tsung Yuen Ha Village House No. 63
6-Oct-15 11:21 50.5 51.9 49.1 54.0 56.6 49.7 58.7 62.7 50.8 51.1 53.2 47.9 50.3 49.9 47.6 52.5 54.5 47.8 54 NA
12-Oct-15 13:26 65.4 71.5 57.0 58.2 60.9 52.9 62.9 65.5 57.1 64.3 66.9 58.6 63.2 66.3 56.6 64.3 67.3 56.6 64 NA
17-Oct-15 10:41 61.4 64.8 54.1 62.6 67.0 51.9 55.8 57.6 52.9 64.8 68.1 55.9 64.6 68.1 56.1 64.4 67.7 55.3 63 NA
23-Oct-15 10:28 61.4 60.4 53.5 54.0 55.7 52.2 55.7 57.9 52.4 54.4 56.3 51.5 54.4 56.5 52.0 53.8 56.4 50.9 57 NA
29-Oct-15 10:21 52.3 54.0 49.9 50.8 52.5 48.6 51.0 52.8 48.7 53.1 56.3 49.0 56.4 58.3 52.2 61.2 63.9 54.3 56 NA
NM2 - Village House near Lin Ma Hang Road
6-Oct-15 14:23 55.6 58.0 51.3 67.1 69.9 63.1 68.3 70.7 62.3 69.0 70.6 64.3 68.1 69.7 62.0 63.5 67.7 54.9 67 NA
12-Oct-15 13:23 68.1 69.8 57.2 60.3 62.3 55.3 66.3 69.7 56.0 60.9 63.1 55.4 62.8 66.0 52.4 63.4 66.8 53.8 65 NA
17-Oct-15 11:28 58.4 60.9 48.8 64.8 65.9 53.7 57.9 59.3 49.9 56.1 59.6 47.8 56.9 59.6 47.6 58.4 60.9 48.8 60 NA
23-Oct-15 10:38 66.4 69.0 50.8 61.4 65.7 49.9 60.8 63.8 50.4 55.9 59.9 49.1 59.3 60.7 49.6 60.3 63.7 49.7 62 NA
29-Oct-15 11:17 62.8 63.0 47.6 54.9 53.7 46.3 62.6 60.7 43.9 61.9 64.7 48.0 59.7 62.8 46.0 55.8 59.7 45.2 61 NA
NM3 - Ping Yeung Village House
26-Oct-15 11:30 61.7 62.5 48.0 52.4 52.0 47.5 60.8 59.5 48.5 58.5 55.5 48.5 55.7 56.5 47.0 48.8 50.0 46.0 58 NA
31-Oct-15 14:23 64.4 65.5 50.0 61.8 63.5 49.5 59.7 62.5 49.0 60.3 62.0 49.0 61.0 62.5 49.5 58.6 61.5 48.5 61 NA
NM4 - Wo Keng Shan Village House
26-Oct-15 14:56 61.9 62.0 52.0 60.2 60.5 53.5 58.6 59.5 53.0 62.6 64.5 53.0 59.0 60.0 52.5 55.3 57.0 51.0 60 NA
31-Oct-15 13:35 63.2 66.0 58.5 62.6 65.5 58.0 64.7 66.5 58.5 62.4 65.5 57.5 66.0 68.0 58.5 64.1 67.0 58.0 64 NA
NM5– Ping Yeung Village House (façade facing northeast)
2-Oct-15 17:07 54.1 55.6 52.2 53.8 55.4 52.2 54.5 56.1 52.9 53.6 55.0 51.2 54.5 56.2 53.0 53.7 55.7 51.4 54 NA
8-Oct-15 11:16 52.9 55.5 47.5 53.8 56.0 47.0 54.0 56.5 49.0 53.0 56.0 48.0 54.5 48.0 48.5 53.4 48.0 48.5 54 NA
14-Oct-15 11:21 55.1 56.0 46.5 51.1 53.5 43.0 49.6 53.0 42.0 48.9 52.0 41.0 51.1 54.5 44.5 50.7 53.0 44.5 52 NA
20-Oct-15 13:00 54.6 57.0 49.0 53.7 57.0 43.5 45.1 57.5 46.0 55.2 58.5 47.5 56.1 53.0 43.0 52.0 55.0 45.0 54 NA
26-Oct-15 10:20 55.0 56.0 535.0 55.9 57.5 54.0 56.0 57.5 54.0 57.1 59.0 54.5 56.2 58.5 53.5 58.4 62.0 54.5 57 NA
31-Oct-15 10:43 49.3 52.0 43.0 54.2 57.0 46.5 65.9 59.5 45.0 61.6 63.0 49.5 52.7 55.0 49.0 55.2 57.5 48.5 60 NA
NM6 – Tai Tong Wu Village House 2
2-Oct-15 16:04 62.7 66.8 52.6 63.5 66.8 56.2 60.6 64.5 48.7 62.2 65.5 52.0 61.4 64.7 55.1 62.4 65.9 53.7 62 NA
8-Oct-15 11:18 61.9 65.2 56.0 60.1 62.6 55.4 61.1 64.0 56.2 60.4 63.6 55.1 61.6 65.3 55.5 61.5 64.6 55.8 61 NA
14-Oct-15 11:26 62.5 66.1 54.4 61.1 64.2 51.7 61.8 65.6 52.6 61.9 66.0 51.0 61.5 65.7 51.5 61.3 65.1 52.5 62 NA
20-Oct-15 11:28 62.9 65.5 54.5 63.2 66.5 54.0 63.1 65.0 50.0 62.6 65.5 51.0 61.1 64.5 46.5 63.1 66.0 52.0 63 NA
26-Oct-15 11:04 59.5 58.0 51.0 55.2 57.0 52.0 53.9 54.5 51.5 53.7 54.5 51.5 52.4 53.0 50.5 58.7 57.0 50.5 56 NA
31-Oct-15 10:38 60.5 63.2 54.3 57.6 60.0 53.8 59.4 62.5 51.6 59.1 62.7 51.5 58.9 62.6 49.8 59.0 62.6 51.0 59 NA

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Date Start Time 1st Leq5mi n L10 L90 2nd Leq5mi n L10 L90 3nd Leq5mi n L10 L90 4th Leq5mi n L10 L90 5th Leq5mi n L10 L90 6th Leq5mi n L10 L90 Leq30 façade correctio n
NM7 – Po Kat Tsai Village
2-Oct-15 15:17 63.2 66.5 50.0 60.6 64.5 49.5 59.5 63.0 50.0 57.9 59.0 48.5 59.7 63.0 49.5 65.0 65.0 55.0 62 NA
8-Oct-15 10:06 67.6 69.0 57.5 63.1 64.5 49.5 58.5 60.0 49.0 56.9 58.0 49.0 58.0 58.0 48.0 61.5 59.5 48.5 63 NA
14-Oct-15 10:41 57.8 60.0 50.5 52.0 53.0 50.0 59.5 60.0 50.5 57.9 57.5 49.5 50.5 51.0 47.5 61.8 60.5 49.0 58 NA
20-Oct-15 11:14 56.2 58.1 50.4 60.4 63.6 52.7 66.9 64.8 51.7 65.0 60.9 50.4 53.9 53.0 50.0 55.7 55.2 52.0 62 NA
26-Oct-15 17:14 56.2 58.5 47.5 53.5 55.5 47.5 54.6 54.5 46.5 53.8 55.5 48.0 52.4 54.5 47.0 51.9 54.0 47.8 54 NA
31-Oct-15 11:32 56.4 57.7 52.9 56.5 57.2 52.2 57.7 60.0 53.2 55.1 55.9 52.9 61.7 58.3 55.2 65.3 62.1 55.1 60 NA
NM8 - Village House, Tong Hang
6-Oct-15 15:32 62.5 65.2 58.4 65.7 68.1 59.7 64.2 67.9 59.7 63.4 64.7 59.9 62.7 66 59.9 62.8 66.8 59 64 NA
12-Oct-15 10:33 59.6 63.4 53.2 59.9 62.8 54.1 58.6 61 55.1 58.7 61.7 52.2 56.5 59.1 51.2 58.1 60.4 51.8 59 NA
17-Oct-15 11:24 55.2 58.3 47.2 56.2 61.4 47.9 58.5 63.3 47.8 55.6 60.7 44.9 53.9 55.4 45.2 57.4 63.4 46.8 56 NA
23-Oct-15 11:35 56.6 57.5 51 56.3 60 50.5 57.5 61 52 58 61.5 51.5 59.4 63.5 53 59.8 64 54 58 NA
29-Oct-15 11:38 53.3 55 50.5 55.1 58 50.5 56.6 59.5 51 55.2 59 50 54 55.5 50 55.5 58 48.5 55 NA
NM9 - Village House, Kiu Tau Village
6-Oct-15 16:21 67.2 68.5 59.2 66.9 70.4 59.8 66.0 69.9 59.4 62.4 66.4 57.2 61.2 63.1 57.2 60.5 63.0 58.4 65 NA
12-Oct-15 11:23 60.0 63.4 53.7 61.4 637.0 53.0 64.7 67.0 55.3 61.2 64.4 55.1 62.6 65.9 53.5 62.1 63.6 52.6 62 NA
17-Oct-15 10:59 58.7 62.0 54.0 59.1 62.5 53.5 60.9 64.5 55.5 61.0 64.5 55.5 59.2 62.0 54.5 62.5 64.0 55.0 60 NA
23-Oct-15 10:55 57.9 60.5 53.0 59.1 63.5 52.0 56.3 58.5 51.0 57.0 59.5 51.5 58.3 62.5 51.5 58.6 62.5 51.0 58 NA
29-Oct-15 10:56 58.7 63.0 51.0 59.8 57.5 50.0 54.4 57.0 51.0 56.9 59.5 52.0 59.0 62.0 53.0 61.0 62.5 59.0 59 NA
NM10 - Nam Wa Po Village House No. 80
6-Oct-15 10:22 66.7 68.7 63.4 66.8 67.6 63.6 67.4 67.8 63.8 67.6 69.3 63.9 68.2 69.1 63.1 68.0 69.5 63.5 67 70
12-Oct-15 13:21 63.4 64.4 61.5 63.4 64.6 62.1 61.9 63.5 59.8 62.2 63.5 60.7 62.5 63.6 60.9 61.9 63.1 60.5 63 66
17-Oct-15 10:17 66.8 68.5 61.0 62.7 64.0 60.5 63.5 65.0 61.5 62.5 63.5 61.0 62.1 63.5 60.0 64.6 66.0 61.0 64 67
23-Oct-15 9:16 61.8 64.0 54.5 62.8 64.5 60.5 62.1 63.5 60.5 63.0 64.5 61.0 62.2 63.5 60.0 63.0 65.0 60.5 63 66
29-Oct-15 9:09 62.4 65.0 55.5 64.7 67.0 61.0 65.7 68.0 61.0 70.0 69.5 59.0 68.0 70.0 60.0 67.8 71.5 58.5 67 70

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Water Quality Monitoring Data for Contract 5 and SS C505

Date 3-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 10:32 0.43 25.6 25.6 7 7.0 85.6 85.8 13.5 13.4 9.1 9.1 13 13.0
25.6 7.04 86.0 13.3 9.1 13
WM1 11:01 0.22 25.5 25.5 7.18 7.2 87.7 87.7 14.1 14.3 8.9 8.9 5 4.5
25.5 7.18 87.7 14.5 8.9 4
Date 6-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 11:47 0.58 25.5 25.5 7 7.0 85.5 85.2 116.0 117.5 9.9 9.9 93 91.5
25.5 6.95 84.9 119.0 9.9 90
WM1 12:19 0.37 25.3 25.3 7.34 7.3 89.5 88.5 120.0 121.5 9.4 9.4 92 94.5
25.3 7.18 87.5 123.0 9.4 97
Date 8-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 10:11 0.52 25.5 25.5 7.05 7.0 86.1 85.7 9.0 9.0 9.3 9.3 <2 2.0
25.5 6.98 85.2 9.1 9.3 <2
WM1 10:38 0.28 26 26.0 7.18 7.2 88.5 88.6 9.7 9.5 8.5 8.5 <2 2.0
26 7.2 88.7 9.3 8.5 <2
Date 10-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 12:00 0.50 23.7 23.7 8.52 8.5 101.2 101.1 8.7 8.6 9.7 9.7 4 3.5
23.7 8.5 100.9 8.6 9.7 3
WM1 12:34 0.28 24 24.0 8.8 8.8 104.5 104.3 8.8 8.8 9.5 9.5 4 4.5
24 8.76 104.0 8.8 9.5 5
Date 12-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 13:40 0.44 23.1 23.1 7.77 7.7 91.1 90.7 7.3 7.3 8.5 8.5 <2 2.0

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

23.1 7.7 90.3 7.3 8.5 2
WM1 14:07 0.26 23.3 23.3 7.9 7.9 92.7 92.9 8.8 8.9 8.3 8.3 <2 2.0
23.3 7.94 93.1 8.9 8.3 <2
Date 14-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 14:49 0.44 27 27.0 7.01 7.0 88.4 88.3 11.9 11.8 10 10.0 3 3.0
27 7.08 88.2 11.7 10 3
WM1 14:24 0.24 27.2 27.2 7.2 7.2 90.7 91.1 10.7 10.9 9.5 9.5 4 4.0
27.2 7.25 91.4 11.0 9.5 4
Date 17-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 10:50 0.43 24 24.0 8.11 8.1 96.4 96.2 9.3 9.4 9.4 9.4 3 3.0
24 8.07 95.9 9.5 9.4 3
WM1 11:19 0.24 24.6 24.6 8.41 8.4 99.6 99.5 11.4 11.6 9.5 9.5 3 3.5
24.6 8.37 99.3 11.7 9.5 4
Date 20-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 12:22 0.44 24.2 24.2 8.53 8.5 101.6 101.3 10.7 10.6 9 9.0 5 5.5
24.2 8.47 101.0 10.4 9 6
WM1 12:57 0.23 24.7 24.7 8.68 8.7 104.4 104.6 9.5 9.4 8.8 8.8 6 6.0
24.7 8.7 104.7 9.4 8.8 6
Date 22-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 11:21 0.41 25.6 25.6 8.3 8.3 105.1 104.9 23.1 22.9 8.6 8.3 18 17.5
25.6 8.27 104.7 22.7 8 17
WM1 11:54 0.23 25.8 25.8 8.22 8.2 101.8 101.8 20.2 20.4 8.7 8.7 17 17.5
25.8 8.23 101.8 20.6 8.7 18

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Date 24-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 11:53 0.43 25 25.0 7.84 7.8 94.2 94.1 10.1 10.3 8 8.0 4 4.0
25 7.8 94.0 10.5 8 4
WM1 12:19 0.26 25.7 25.7 8.59 8.6 105.3 105.3 11.0 10.9 8.6 8.6 5 5.0
25.7 8.58 105.2 10.7 8.6 5
Date 27-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 14:19 0.37 28.6 28.6 7.31 7.3 94.5 94.2 10.3 10.2 10 10.0 3 3.5
28.6 7.26 93.9 10.0 10 4
WM1 14:43 0.22 28.7 28.4 8.16 8.2 105.4 106.3 9.7 9.8 9.3 9.3 4 4.0
28 8.3 107.2 9.8 9.3 4
Date 29-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 10:32 0.21 24.5 24.5 7.25 7.2 86.9 86.8 11.6 11.6 7.9 7.9 7 8.0
24.5 7.23 86.6 11.5 7.9 9
WM1 11:04 0.23 25.4 25.4 7.76 7.8 94.6 94.9 9.8 9.9 8.7 8.7 5 5.5
25.4 7.8 95.1 9.9 8.6 6
Date 31-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM1-C 14:48 0.28 27.9 27.9 9.22 9.2 117.6 117.3 10.1 9.7 8.1 8.1 15 15.0
27.9 9.17 116.9 9.3 8.1 15
WM1 15:16 0.20 27.5 27.5 7.77 7.7 98.4 98.0 14.2 14.9 7.7 7.7 3 3.0
27.5 7.71 97.6 15.6 7.7 3

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Water Quality Monitoring Data for Contract 2 and 3

Date 3-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 12:16 0.10 26.5 26.5 7.27 7.3 92.1 92.7 4.1 4.1 7.9 7.9 3 3.0
26.5 7.35 93.2 4.1 7.9 3
WM4-CB 12:38 0.26 27.5 27.5 6.31 6.3 79.9 79.6 9.7 9.7 7.6 7.6 9 9.5
27.5 6.26 79.3 9.7 7.6 10
WM4 11:54 0.33 26.8 26.8 6.34 6.3 79.3 79.0 13.5 13.3 8 8.0 12 12.0
26.8 6.29 78.7 13.1 8 12
Date 6-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 16:27 0.28 25 25.0 7.25 7.3 87.8 87.9 141.0 144.5 8.8 8.8 126 127.0
25 7.26 87.9 148.0 8.8 128
WM4-CB 16:45 0.47 25.7 25.7 6.85 6.8 83.9 83.8 55.2 55.6 8.1 8.1 32 33.0
25.7 6.83 83.7 55.9 8.1 34
WM4 15:54 0.52 25.6 25.6 7.28 7.3 89.2 89.4 139.0 139.0 9.2 9.2 114 115.5
25.6 7.31 89.5 139.0 9.2 117
Date 8-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 15:07 0.15 25.8 25.8 7.88 7.9 96.8 96.7 9.0 8.9 7.8 7.8 <2 2.0
25.8 7.85 96.5 8.9 7.8 <2
WM4-CB 13:50 0.29 28.4 28.4 6.57 6.6 84.6 84.5 13.6 13.8 7.8 7.8 4 5.0
28.4 6.55 84.3 13.9 7.8 6
WM4 13:31 0.38 27.9 27.9 7.88 7.9 91.8 91.3 13.0 13.0 7.3 7.3 3 3.5
27.9 7.85 90.8 13.0 7.3 4
Date 10-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 14:51 0.15 23.9 23.9 7.56 7.5 99.5 99.1 8.0 7.9 8.5 8.5 9 8.5
23.9 7.46 98.6 7.9 8.5 8
WM4-CB 15:15 0.27 25 25.0 6.33 6.3 89.6 89.1 17.8 17.8 7.9 7.9 20 19.5

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

25 6.26 88.6 17.7 7.9 19
WM4 14:21 0.41 24 24.0 8.36 8.3 76.7 76.3 13.2 13.4 8.6 8.6 12 12.0
24 8.29 75.9 13.5 8.6 12
Date 12-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 15:07 0.13 23 23.0 7.75 7.8 90.2 91.1 7.0 7.0 7.7 7.7 3 3.0
23 7.89 91.9 6.9 7.7 3
WM4-CB 15:21 0.28 24.9 24.9 6.37 6.5 76.9 78.1 9.5 9.6 7.3 7.3 7 7.5
24.9 6.55 79.2 9.8 7.3 8
WM4 14:48 0.38 24.1 24.1 7.63 7.7 90.8 91.1 15.0 15.2 7.6 7.6 8 7.5
24 7.69 91.4 15.3 7.6 7
Date 14-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 16:36 0.11 24.9 24.9 7.34 7.3 88.6 88.4 4.9 4.9 8.4 8.4 3 3.0
24.9 7.3 88.2 5.0 8.4 3
WM4-CB 16:59 0.24 26 26.0 5.66 5.6 69.8 69.4 13.2 13.4 8 8.0 14 13.0
26 5.6 68.9 13.6 8 12
WM4 16:06 0.31 26.9 26.9 6.62 6.6 83.1 82.2 11.5 11.4 8.7 8.7 7 8.0
26.9 6.48 81.2 11.2 8.7 9
Date 17-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 10:59 0.14 25.3 25.3 8.87 8.9 107.9 107.6 5.5 5.5 7.4 7.4 3 3.0
25.3 8.83 107.3 5.6 7.4 3
WM4-CB 10:22 0.22 27.6 27.6 8.53 8.5 106.4 106.0 12.3 12.4 7.1 7.1 14 14.0
27.6 8.51 105.6 12.5 7.1 14
WM4 12:10 0.28 26.3 26.3 8.54 8.6 108.3 108.9 15.9 15.8 7.4 7.4 16 15.5
26.3 8.61 109.5 15.7 7.4 15
Date 20-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

WM4-CA 15:47 0.12 25.7 25.7 7.82 7.8 95.7 95.4 6.4 6.6 8.5 8.5 6 6.0
25.7 7.77 95.1 6.8 8.5 6
WM4-CB 16:04 0.22 26.6 26.6 7.08 7.1 88.3 88.1 12.1 12.0 8 8.0 12 12.5
26.6 7.05 87.9 11.8 8 13
WM4 15:31 0.31 27 27.0 7.56 7.5 95.0 94.8 16.8 17.1 7.9 7.9 18 17.5
27 7.52 94.5 17.3 7.9 17
Date 22-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 13:29 0.11 26.8 26.9 7.8 7.8 97.6 97.5 7.5 7.6 8 8.0 3 3.5
26.9 7.77 97.3 7.7 8 4
WM4-CB 13:51 0.19 28.5 28.5 7.3 7.3 94.2 94.7 13.1 12.9 7.5 7.5 8 9.0
28.5 7.37 95.1 12.7 7.5 10
WM4 13:10 0.29 27.7 27.7 7.63 7.6 97.0 97.1 11.0 11.1 8 8.0 5 5.0
27.7 7.65 97.2 11.2 8 5
Date 24-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 13:03 0.11 26.7 26.7 7.68 7.7 96.0 95.8 7.7 7.7 8.2 8.2 6 7.0
26.7 7.65 95.5 7.6 8.2 8
WM4-CB 13:29 0.23 28.1 28.1 6.93 6.9 88.7 88.5 19.0 18.8 7.7 7.7 16 15.5
28.1 6.89 88.3 18.6 7.7 15
WM4 12:43 0.29 28.1 28.1 7.33 7.4 93.8 94.5 13.6 13.5 8.2 8.2 10 9.5
28.1 7.44 95.2 13.3 8.2 9
Date 27-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 17:03 0.11 26.5 26.5 7.15 7.1 89.0 88.8 6.9 6.6 8.4 8.4 4 4.5
26.5 7.12 88.5 6.4 8.4 5
WM4-CB 17:25 27.5 27.5 3.2 3.2 40.5 40.6 17.2 17.5 7.6 7.6 21 20.5
27.5 3.21 40.7 17.7 7.6 20
WM4 16:49 0.29 28.1 28.1 6.07 6.1 77.7 77.4 18.3 18.6 8.7 8.7 16 15.0
28.1 6.03 77.1 18.9 8.7 14

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Date 29-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 12:28 0.10 27.5 27.5 7.74 7.7 98.1 97.8 6.2 6.3 8.1 8.1 6 6.0
27.5 7.69 97.4 6.4 8.1 6
WM4-CB 14:45 0.19 29.3 29.3 7.42 7.4 97.0 96.6 15.4 15.2 7.6 7.6 17 16.5
29.3 7.35 96.1 15.0 7.6 16
WM4 12:16 0.26 28.1 28.1 7.78 7.8 99.6 99.9 13.7 13.9 8.1 8.1 13 12.0
28.1 7.82 100.2 14.0 8.1 11
Date 31-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM4-CA 13:31 0.10 27.1 27.1 7.29 7.2 91.8 90.6 7.0 7.1 8.2 8.2 11 12.0
27.1 7.09 89.3 7.2 8.2 13
WM4-CB 13:50 0.21 29 29.0 7.24 7.2 94.2 94.1 19.8 19.7 7.6 7.6 6 6.0
29 7.21 93.9 19.5 7.6 6
WM4 13:16 0.23 28.3 28.3 7.72 7.7 99.2 99.5 15.4 15.3 8.5 8.5 22 22.5
28.3 7.77 99.8 15.1 8.4 23

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Water Quality Monitoring Data for Contract 6

Date 23-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2A-C 13:06 0.27 24.8 24.8 7.85 7.8 94.6 94.3 6.9 6.9 8.60 8.6 <2 2.0
24.8 7.79 94.0 6.9 8.60 <2
WM2A 12:06 0.15 27 27.0 7.74 7.7 97.0 96.8 35.3 35.9 8.90 8.9 26 27.0
27 7.7 96.6 36.4 8.90 28
Date 26-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2A-C 13:00 0.28 24.8 24.8 7.5 7.5 90.5 90.7 11.7 11.4 8.50 8.5 9 9.0
24.8 7.53 90.9 11.0 8.50 9
WM2A 12:27 0.15 25.7 25.7 7.63 7.6 93.5 93.7 110.0 110.0 9.00 9.0 74 73.5
25.7 7.65 93.8 110.0 9.00 73
Date 28-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2A-C 11:30 0.42 24.4 24.5 7.52 7.5 90.1 90.0 11.4 11.2 8.70 8.7 <2 2.0
24.5 7.49 89.8 10.9 8.70 2
WM2A 11:02 0.15 26.3 26.3 7.8 7.8 96.7 96.8 35.3 34.9 9.10 9.1 30 29.0
26.3 7.81 96.9 34.4 9.10 28
Date 30-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2A-C 15:15 0.43 25.1 25.1 8.12 8.1 98.4 98.1 10.9 10.6 8.70 8.7 <2 2.0
25.1 8.06 97.7 10.3 8.70 2
WM2A 14:25 0.16 28.2 28.2 7.6 7.6 97.5 97.7 43.9 44.7 9.20 9.2 41 41.5
28.2 7.62 97.8 45.5 9.10 42

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Date 23-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2B-C 15:16 0.01 24.9 24.9 7.73 7.8 99.3 99.6 6.6 6.7 8.00 8.0 5 6.0
24.9 7.77 99.9 6.8 8.00 7
WM2B 14:56 0.02 27.6 27.6 7.74 7.7 98.2 97.6 84.8 86.2 8.30 8.3 94 92.0
27.6 7.63 97.0 87.6 8.30 90
Date 26-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2B-C 16:07 0.02 24.4 24.4 7.31 7.3 87.5 87.7 4.3 4.4 8.00 8.0 3 2.5
24.4 7.34 87.8 4.5 8.00 2
WM2B 15:44 0.02 25.6 25.6 7.77 7.8 95.1 95.3 15.7 15.4 8.30 8.3 9 8.5
25.6 7.8 95.4 15.1 8.30 8
Date 28-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2B-C 12:20 0.03 25.6 25.6 7.79 7.8 95.3 95.5 3.0 3.0 8.00 8.0 2 2.0
25.6 7.82 95.7 3.1 8.00 <2
WM2B 11:51 0.02 28.7 28.7 8.25 8.2 106.6 106.5 27.3 27.5 8.20 8.2 19 18.5
28.7 8.24 106.4 27.6 8.10 18
Date 30-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM2B-C 15:59 0.30 25 25.0 7.78 7.8 94.2 94.1 4.3 4.4 7.90 7.9 4 3.5
25 7.76 93.9 4.5 7.80 3
WM2B 15:39 0.30 27.6 27.7 7.74 7.7 98.3 98.2 26.0 25.8 8.10 8.1 14 13.5
27.7 7.73 98.1 25.6 8.10 13

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.27) – October 2015

Water Quality Monitoring Data for Contract 2 and 6

Date 23-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM3-C 15:34 0.06 26.6 26.6 6.62 6.7 82.5 82.9 18.9 18.3 10.00 10.0 32 33.0
26.6 6.68 83.3 17.6 10.00 34
WM3 15:51 0.21 25.4 25.4 6.96 7.0 84.9 85.0 14.9 14.8 9.10 9.1 14 13.0
25.4 6.97 85.0 14.7 9.10 12
Date 26-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM3-C 17:00 0.04 25.6 25.6 6.75 6.8 82.7 83.1 18.6 18.3 8.80 8.8 18 17.5
25.6 6.82 83.5 17.9 8.80 17
WM3 16:33 0.19 25.3 25.3 7.28 7.3 88.6 89.0 9.9 9.9 7.60 7.6 8 8.5
25.3 7.34 89.3 10.0 7.60 9
Date 28-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM3-C 13:01 0.02 27.7 27.7 7.34 7.3 93.3 92.9 8.3 8.5 7.60 7.6 13 12.5
27.7 7.27 92.4 8.8 7.60 12
WM3 13:21 0.22 26.6 26.6 7.21 7.2 89.9 90.2 8.2 8.1 7.80 7.8 6 6.5
26.6 7.26 90.5 8.0 7.80 7
Date 30-Oct-15
Location Time Depth (m) Temp (oC) DO (mg/L) DO (%) Turbidity (NTU) pH SS(mg/L)
WM3-C 16:20 0.02 26.6 26.6 6.68 6.7 83.8 83.7 7.3 6.9 7.30 7.3 7 7.0
26.6 6.7 83.5 6.5 7.30 7
WM3 16:41 0.21 25.4 25.4 7.29 7.3 88.9 88.8 9.5 9.7 7.60 7.6 5 6.0
25.4 7.28 88.6 10.0 7.50 7