Sang Hing Civil – Richwell Machinery JV

10.0 Monthly Summary Waste Flow Table for 2013

Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Month Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000ton) (in '000ton) (in '000ton) (in '000ton) (in '000ton) (in '000ton) (in '000ton) (in '000ton) (in '000ton) (in '000ton) (in '000ton)
JAN
FEB
MAR
APRIL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
MAY 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
JUN 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
JUL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.00064
AUG 0.000 0.000 0.000 0.000 0.000 1.465 0.000 0.000 0.000 0.000 0.000
SEP 0.000 0.000 0.000 0.000 0.000 0.788 0.000 0.000 0.000 0.000 0.048
OCT 0.000 0.000 0.000 0.000 0.000 47.063 0.000 0.000 0.000 0.000 0.996
Sub Total 0.000 0.000 0.000 0.000 0.000 49.316 0.000 0.000 0.000 0.000 1.045
NOV
DEC
Total 0.000 0.000 0.000 0.000 0.000 49.316 0.000 0.000 0.000 0.000 1.045
Notes :
(1) Note Used.
(2) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Sites.
(3) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging materials.
(4) The summary table shall be submitted to the Engineer's Representative monthly together with the Waste Flow Table for review and monitoring.

Page 9 of 9