Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.10) –May 2014

Contract 2

Z:\Jobs\2013\TCS00670(CV201303)\600\EM&A Report\Monthly EM&A Report\10th (May 2014)\R0184v2.docx

2014 Start Finish

ActivityID ActivityName BLProject BLProject

Jun Jul Aug 6 78

DSN011770 PreparationofAIPSubmissionforVentilationBuildingsFoundationDesign DSN011780 Review&CommentbyDHK DSN011790 DesignerPrepareAIP DSN011800 FormalSubmissionofAIPtoICE/IPs(exceptGEO) DSN011810 AdvancedSubmissionofAIPtoER DSN011820 Review&CommentbyER/ICE/IPs DSN011830 AdvanceCommentsfromER/CommentsfromICE/IPsReceived DSN011840 DesignertoPrepareRtC&UpdatedAIP DSN011850 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC) DSN011860 ReplytoIPsCommentsinRTC DSN011870 ICEApproval&IssueofDesignCheckCert. DSN011930 ERReview(35Days)

ission

DSN011950 PreparationofDDASubmissionforVentilationBuildingsFoundationDesign DSN011960 Review&CommentbyDHK

TempCLP SwitchRoom s

ssion

TSS3P207640 Preparation&ApprovalForCLPRoom TSS3P207810 ERApprovalwithConditionReceived

ission

TSS3P207820 PreparationofDDASubmissionforMidVentTempCLPSwitchRoom TSS3P207830 Review&CommentbyDHK TSS3P207840 DesignerprepareDDA TSS3P207850 FormalSubmissionofDDAtoICE/IPs TSS3P207860 AdvancedSubmissiontoER TSS3P207870 IPs'/ER'sAdvanceComments/ICEComments

orta

ortal: TempSupport forMinedandD&BTunnelling

ission

DSN026980 DesignerPrepareDDA DSN026990 SubmissionofDDAtoICE/IPs DSN027000 ICEApproval&IssueCheckCert DSN027010 SubmitICECheckCerttoER+ERforwardtoGEO DSN027020 IPsReview DSN027030 IPsNoObjectionReceived DSN027040 SubmissiontoER DSN027050 ERforwardDDAtoGEO(w/oICECert.) DSN027060 GEOReview DSN027070 GEOCommentsReceived DSN027080 ERReview DSN027090 ERApprovalwithConditionReceived

Adit Permanent Lining s

ssion

TSS33P207660 DesignerPrepareAIP TSS33P207670 FormalSubmissionofAIPtoICE/IPs(exceptGEO) TSS33P207680 AdvancedSubmissionofAIPtoER TSS33P207690 Review&CommentbyER/ICE/IPs TSS33P207700 AdvanceCommentsfromER/CommentsfromICE/IPsReceived TSS33P207710 DesignertoPrepareRtC&UpdatedAIP TSS33P207720 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC) TSS33P207730 ReplytoIPsCommentsinRTC TSS33P207740 ICEApproval&IssueofDesignCheckCert. TSS33P207750 CheckCerttoER,ERForwardstoGEO TSS33P207760 NoObjectionorFurtherMinorCommentsfromIPsReceived TSS33P207800 ERReview(35Days) TSS33P207810 ERApprovalwithConditionReceived

Adit InternalStructure s

ssion

MVPIS13P2076 PreparationofAIPSubmissionforMidVentPermanentInternalStructure(CastInsitu) MVPIS13P2076 Review&CommentbyDHK MVPIS13P2076 DesignerPrepareAIP MVPIS13P2076 FormalSubmissionofAIPtoICE/IPs(exceptGEO) MVPIS13P2076 AdvancedSubmissionofAIPtoER MVPIS13P2076 Review&CommentbyER/ICE/IPs MVPIS13P2077 AdvanceCommentsfromER/CommentsfromICE/IPsReceived MVPIS13P2077 DesignertoPrepareRtC&UpdatedAIP MVPIS13P2077 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC)

PrimaryBaseline CriticalActivity

01-Apr-14 03-May-14 undationDesign
05-May-14 17-May-14 CommentbyDHK
19-May-14 24-May-14 DesignerPrepareAIP
24-May-14 FormalSubmissionofAIPtoICE/IPs(exceptGEO)
24-May-14 AdvancedSubmissionofAIPtoER
26-May-14 23-Jun-14 Review&CommentbyER/ICE/IPs
23-Jun-14 AdvanceCommentsfromER/CommentsfromICE/IPsReceived
24-Jun-14 15-Jul-14
DesignertoPrepareRtC&UpdatedAIP
15-Jul-14 SubmissionofA IPtoER/ICEtogetherwithReplyToComment(RTC)
15-Jul-14 ReplytoIPsCommentsinRTC
16-Jul-14 05-Aug-14 ICEApproval&Iss ueofDesignCheckCert.
22-Jul-14 18-Aug-14 ERRe
03-Jul-14 23-Oct-14
03-Jul-14 30-Jul-14
PreparationofDDASubmissionforVentilationBuildingsFoundationDes
31-Jul-14 23-Oct-14
17-Jan-14 09-Aug-14
17-Jan-14 29-May-14
17-Jan-14 29-May-14 Preparation&ApprovalForCLPRoom
29-May-14 ERApprovalwithConditionReceived
09-May-14 09-Aug-14
09-May-14 29-May-14 PreparationofDDASubmissi onforMidVentTempCLPSwitchRoom
30-May-14 20-Jun-14 Review&CommentbyDHK
21-Jun-14 08-Jul-14
DesignerprepareDDA
08-Jul-14 FormalSubmissionofDDAtoICE/IPs
08-Jul-14 AdvancedSubmissiontoER
09-Jul-14 09-Aug-14 IPs'/ER'sAdvanceComments/ICEC
29-Mar-14 12-May-14
29-Mar-14 12-May-14
29-Mar-14 07-Apr-14
07-Apr-14
08-Apr-14 24-Apr-14
25-Apr-14 02-May-14
08-Apr-14 05-May-14
05-May-14
07-Apr-14
08-Apr-14 10-Apr-14
11-Apr-14 08-May-14
08-May-14
15-Apr-14 12-May-14
12-May-14 Received
08-Apr-14 18-Jul-14
08-Apr-14 18-Jul-14
08-Apr-14 14-Apr-14
14-Apr-14
14-Apr-14
15-Apr-14 22-May-14 Review&CommentbyER/ICE/IPs
22-May-14 AdvanceCommentsfromER/CommentsfromICE/IPsReceived
23-May-14 13-Jun-14 DesignertoPrepareRtC&UpdatedAIP
13-Jun-14 SubmissionofA IPtoER/ICEtogetherwithReplyToComment(RTC)
13-Jun-14 ReplytoIPsCommentsinRTC
14-Jun-14 05-Jul-14
ICEApproval&Iss ueofDesignCheckCert.
05-Jul-14 CheckCerttoER,ERForwardstoGEO
05-Jul-14 NoObjectionorFurtherMinorCommentsfromIPsReceived
21-Jun-14 18-Jul-14
ERReview(35Days)
18-Jul-14 ERApprovalwithConditionReceived
22-May-14 18-Sep-14
22-May-14 18-Sep-14
22-May-14 05-Jun-14 PreparationofAIPSubmissionforMidVentPermanentInternalStructure(CastInsitu)
06-Jun-14 19-Jun-14
Review&CommentbyDHK
20-Jun-14 04-Jul-14
DesignerPrepareAIP
04-Jul-14 FormalSubmissionofAIPtoICE/IPs(exceptGEO)
04-Jul-14 AdvancedSubmissionofAIPtoER
05-Jul-14 06-Aug-14 Review&CommentbyER/ICE/IPs
06-Aug-14 AdvanceCommentsfromER/CommentsfromIC
07-Aug-14 27-Aug-14
27-Aug-14
Date Revision Checked Approved
28-Feb-14 InitialWorksProgrammeRevB_BL

20-May-14 MonthlyReportNo.5

3-MonthsRolling Programme-MPR5

Milestone

5of1126-May-14/14:55DHK_aLTHK_3MRP_Client_orig

ActivityID ActivityName BLPr oject BLPr oject
Start Finish
DSN013300 ReplytoIPsCommentsinRTC 29-Mar-14
DSN013320 CheckCerttoER,ERForwardstoGEO 08-Apr-14
DSN013330 NoObjectionorFurtherMinorCommentsfromIPsReceived 24-Apr-14
DSN013370 ERReview(35Days) 12-Apr-14 09-May-14
DSN013380 ERApprovalwithConditionReceived 09-May-14
ission 08-Mar-14 17-Aug-14
DSN013390 PreparationofDDASubmissionforFoundationDesign(Nth.Vent.Bldg.) 08-Mar-14 04-Apr-14
DSN013400 Review&CommentbyDHK 07-Apr-14 25-Apr-14
DSN013410 DesignerprepareDDA 26-Apr-14 14-May-14 DA
DSN013420 FormalSubmissionofDDAtoICE/IPs 14-May-14 ofDDAtoICE/IPs
DSN013430 AdvancedSubmissiontoER 14-May-14 ontoER
DSN013440 IPs'/ER'sAdvanceComments/ICEComments 15-May-14 17-Jun-14
DSN013450 CommentsReceived 17-Jun-14
DSN013460 DesignertoReplyRtC+UpdateSubmission 18-Jun-14 12-Jul-14
DSN013470 SubmitUpdatedDDAtoER/ICE/IPs 14-Jul-14
DSN013480 ICEApproval&Iss ueCheckCert 14-Jul-14 26-Jul-14
DSN013500 IPsReview 14-Jul-14 10-Aug-14
DSN013520 ERforwardDDAtoGEO(w/oICECert.) 14-Jul-14 16-Jul-14
DSN013530 GEOReview 17-Jul-14 13-Aug-14
DSN013550 ERReview 14-Jul-14 17-Aug-14
r rtal: Temp.CLPSubstation(nearShaTauKokinterchange 13-Dec-13 13-Aug-14
s ssion 13-Dec-13 03-May-14
DSN029060 PreparationofAIPSubmissionforTemp.CLPSubstation(NearSTKinterchange) 13-Dec-13 03-May-14 NearSTKinterchange)
DSN029230 ERApprovalwithConditionReceived 03-May-14
ission 05-May-14 13-Aug-14
DSN029240 PreparationofDDASubmissionforTemp.CLPSubstation(NearSTKinterchange) 05-May-14 03-Jun-14
DSN029250 Review&CommentbyDHK 04-Jun-14 24-Jun-14
DSN029260 DesignerprepareDDA 25-Jun-14 11-Jul-14
DSN029270 FormalSubmissionofDDAtoICE/IPs 11-Jul-14
DSN029280 AdvancedSubmissiontoER 11-Jul-14
DSN029290 IPs'/ER'sAdvanceComments/ICEComments 12-Jul-14 13-Aug-14
nn nnel Curved Section -Northbound- TempWorksforMined 15-Mar-14 17-Jul-14
ission 15-Mar-14 17-Jul-14
CPTTS11265 Review&CommentbyDHK 15-Mar-14 31-Mar-14
CPTTS11275 DesignerprepareDDA 01-Apr-14 12-Apr-14
CPTTS11285 FormalSubmissionofDDAtoICE/IPs 12-Apr-14
CPTTS11295 AdvancedSubmissiontoER 12-Apr-14
CPTTS11305 IPs'/ER'sAdvanceComments/ICEComments 14-Apr-14 16-May-14 vanceComments/ICEComments
CPTTS11315 CommentsReceived 16-May-14 eceived
CPTTS11325 DesignertoReplyRtC+UpdateSubmission 17-May-14 11-Jun-14
CPTTS11335 SubmitUpdatedDDAtoER/ICE/IPs 12-Jun-14
CPTTS11345 ICEApproval&Iss ueCheckCert 12-Jun-14 25-Jun-14
CPTTS11355 SubmitICECheckCerttoER+ERforwardtoGEO 26-Jun-14 03-Jul-14
CPTTS11365 IPsReview 12-Jun-14 09-Jul-14
CPTTS11375 IPsNoObjectionReceived 09-Jul-14
CPTTS11415 ERReview 20-Jun-14 17-Jul-14
nn nnel Curved Section -Southbound-TempWorksforMined 15-Mar-14 18-Jul-14
ission 15-Mar-14 18-Jul-14
DSN1265 Review&CommentbyDHK 15-Mar-14 31-Mar-14
DSN1275 DesignerprepareDDA 01-Apr-14 14-Apr-14
DSN1285 FormalSubmissionofDDAtoICE/IPs 14-Apr-14
DSN1295 AdvancedSubmissiontoER 14-Apr-14
DSN1305 IPs'/ER'sAdvanceComments/ICEComments 15-Apr-14 17-May-14 AdvanceComments/ICEComments
DSN1315 CommentsReceived 17-May-14 sReceived
DSN1325 DesignertoReplyRtC+UpdateSubmission 19-May-14 12-Jun-14
DSN1335 SubmitUpdatedDDAtoER/ICE/IPs 13-Jun-14
DSN1345 ICEApproval&Iss ueCheckCert 13-Jun-14 26-Jun-14
DSN1355 SubmitICECheckCerttoER+ERforwardtoGEO 27-Jun-14 04-Jul-14
DSN1365 IPsReview 13-Jun-14 10-Jul-14
DSN1375 IPsNoObjectionReceived 10-Jul-14
DSN1415 ERReview 21-Jun-14 18-Jul-14
nn nnel Curved Section Southbound Temp SegmentalLining 25-Jul-14 11-Sep-14
ission 25-Jul-14 11-Sep-14
FL2013390 PreparationofDDASubmission 25-Jul-14 21-Aug-14
FL2013400 Review&CommentbyDHK 22-Aug-14 11-Sep-14
un unnelSpaceProofing&Sight Assessment 05-Mar-14 07-Apr-14
PrimaryBaseline
CriticalActivity
2014
Jun Jul Aug
6 7 8
IPs'/ER'sAdvanceComments/ICEComments CommentsReceived
DesignertoReplyRtC+UpdateSubmission SubmitUpdatedDDAtoER/ICE/IPs
ICEApproval&Iss ueCheckCert IPsReview
ERforwardDDAtoGEO(w/oICECert.) GEOReview
ERRevie
PreparationofDDASubmissionforTemp.CLPSubstation(NearSTKinterchange) Review&CommentbyDHK DesignerprepareDDA FormalSubmissionofDDAtoICE/IPs AdvancedSubmissiontoER
IPs'/ER'sAdvanceCom

DesignertoReplyRtC+UpdateSubmission SubmitUpdatedDDAtoER/ICE/IPs

ICEApproval&IssueCheckCert SubmitICECheckCerttoER+ERforwardtoGEO IPsReview IPsNoObjectionReceived

ERReview

DesignertoReplyRtC+UpdateSubmission SubmitUpdatedDDAtoER/ICE/IPs

ICEApproval&IssueCheckCert SubmitICECheckCerttoER+ERforwardtoGEO IPsReview IPsNoObjectionReceived

ERReview

Date

Revision

Checked

Approved

28-Feb-14 InitialWorksProgrammeRevB_BL

20-May-14 MonthlyReportNo.5

3-MonthsRolling Programme-MPR5

Milestone

8of1126-May-14/14:55DHK_aLTHK_3MRP_Client_orig

ActivityID ActivityName BLPr oject BLPr oject 2014
Start Finish Jun Jul Aug
6 7 8
s ssion 05-Mar-14 07-Apr-14
DSN023750 Review&CommentbyER/ICE/IPs 05-Mar-14 07-Apr-14
DSN023760 ApprovalfromER/CommentsfromICE/IPsReceived 07-Apr-14
un unnelSegmental Lining 19-Mar-14 11-Aug-14
s ssion 19-Mar-14 21-Jun-14
DSN05530 Review&CommentbyER/ICE/IPs 19-Mar-14 24-Apr-14
DSN05540 AdvanceCommentsfromER/CommentsfromICE/IPsReceived 24-Apr-14
DSN05550 DesignertoPrepareRtC&UpdatedAIP 25-Apr-14 17-May-14 toPrepareRtC&UpdatedAIP
DSN05560 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC) 17-May-14 onofAIPtoER/ICEtogetherwithReplyToComment(RTC)
DSN05570 ReplytoIPsCommentsinRTC 17-May-14 PsCommentsinRTC
DSN05580 ICEApproval&Iss ueofDesignCheckCert. 19-May-14 09-Jun-14 ICEApproval&Iss ueofDesignCheckCert.
DSN05590 CheckCerttoER,ERForwardstoGEO 09-Jun-14 CheckCerttoER,ERForwardstoGEO
DSN05600 NoObjectionorFurtherMinorCommentsfromIPsReceived 09-Jun-14 NoObjectionorFurtherMinorCommentsfromIPsReceived
DSN05640 ERReview(35Days) 25-May-14 21-Jun-14 ERReview(35Days)
DSN05650 ERApprovalwithConditionReceived 21-Jun-14 ERApprovalwithConditionReceived
ission 23-Jun-14 11-Aug-14
DSN05660 PreparationofDDASubmission 23-Jun-14 21-Jul-14 PreparationofDDASubmission
DSN05670 Review&CommentbyDHK 22-Jul-14 11-Aug-14 Review&CommentbyDHK
un unnelOHVD Slab 13-Feb-14 24-Jun-14
s ssion 13-Feb-14 24-Jun-14
BTIS2LR10132 PreparationofAIPSubmissionforBoredTunnelOHVDSlabDesign 13-Feb-14 12-Mar-14
BTIS2LR10132 Review&CommentbyDHK 13-Mar-14 26-Mar-14
BTIS2LR10132 DesignerPrepareAIP 27-Mar-14 02-Apr-14
BTIS2LR10132 FormalSubmissionofAIPtoICE/IPs(exceptGEO) 02-Apr-14
BTIS2LR10132 AdvancedSubmissionofAIPtoER 02-Apr-14
BTIS2LR10132 Review&CommentbyER/ICE/IPs 03-Apr-14 12-May-14 CE/IPs
BTIS2LR10132 AdvanceCommentsfromER/CommentsfromICE/IPsReceived 12-May-14 R/CommentsfromICE/IPsReceived
BTIS2LR10132 DesignertoPrepareRtC&UpdatedAIP 13-May-14 20-May-14 DesignertoPrepareRtC&UpdatedAIP
BTIS2LR10132 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC) 20-May-14 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC)
BTIS2LR10133 ReplytoIPsCommentsinRTC 20-May-14 ReplytoIPsCommentsinRTC
BTIS2LR10133 ICEApproval&Iss ueofDesignCheckCert. 21-May-14 28-May-14 ICEApproval&Iss ueofDesignCheckCert.
BTIS2LR10133 CheckCerttoER,ERForwardstoGEO 28-May-14 CheckCerttoER,ERForwardstoGEO
BTIS2LR10133 NoObjectionorFurtherMinorCommentsfromIPsReceived 11-Jun-14 NoObjectionorFurtherMinorCommentsfromIPsReceived
BTIS2LR10133 ERReview(35Days) 28-May-14 24-Jun-14 ERReview(35Days)
un unnelInternal Structure(except OHVDSlab) 13-Feb-14 24-Jun-14
s ssion 13-Feb-14 24-Jun-14
BTIS1LR10132 PreparationofAIPSubmissionforBoredTunnelInternalStructure(exceptOHVDSlab) 13-Feb-14 12-Mar-14
BTIS1LR10132 Review&CommentbyDHK 13-Mar-14 26-Mar-14
BTIS1LR10132 DesignerPrepareAIP 27-Mar-14 02-Apr-14
BTIS1LR10132 FormalSubmissionofAIPtoICE/IPs(exceptGEO) 02-Apr-14
BTIS1LR10132 AdvancedSubmissionofAIPtoER 02-Apr-14
BTIS1LR10132 Review&CommentbyER/ICE/IPs 03-Apr-14 12-May-14 CE/IPs
BTIS1LR10132 AdvanceCommentsfromER/CommentsfromICE/IPsReceived 12-May-14 R/CommentsfromICE/IPsReceived
BTIS1LR10132 DesignertoPrepareRtC&UpdatedAIP 13-May-14 20-May-14 DesignertoPrepareRtC&UpdatedAIP
BTIS1LR10132 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC) 20-May-14 SubmissionofAIPtoER/ICEtogetherwithReplyToComment(RTC)
BTIS1LR10133 ReplytoIPsCommentsinRTC 20-May-14 ReplytoIPsCommentsinRTC
BTIS1LR10133 ICEApproval&Iss ueofDesignCheckCert. 21-May-14 28-May-14 ICEApproval&Iss ueofDesignCheckCert.
BTIS1LR10133 CheckCerttoER,ERForwardstoGEO 28-May-14 CheckCerttoER,ERForwardstoGEO
BTIS1LR10133 NoObjectionorFurtherMinorCommentsfromIPsReceived 11-Jun-14 NoObjectionorFurtherMinorCommentsfromIPsReceived
BTIS1LR10133 ERReview(35Days) 28-May-14 24-Jun-14 ERReview(35Days)
un unnel/D&BTunnelTransition -HeadwallStructure (Northbo 09-May-14 25-Aug-14
s ssion 09-May-14 25-Aug-14
FL2LR105480 PreparationofAIPSubmission 09-May-14 04-Jun-14 PreparationofAIPSubmission
FL2LR105490 Review&CommentbyDHK 05-Jun-14 24-Jun-14 Review&CommentbyDHK
FL2LR105500 DesignerPrepareAIP 25-Jun-14 02-Jul-14 DesignerPrepareAIP
FL2LR105510 FormalSubmissionofAIPtoICE/IPs(exceptGEO) 02-Jul-14 FormalSubmissionofAIPtoICE/IPs(exceptGEO)
FL2LR105520 AdvancedSubmissionofAIPtoER 02-Jul-14 AdvancedSubmissionofAIPtoER
FL2LR105530 Review&CommentbyER/ICE/IPs 03-Jul-14 04-Aug-14 Review&CommentbyER/ICE/IPs
FL2LR105540 AdvanceCommentsfromER/CommentsfromICE/IPsReceived 04-Aug-14 AdvanceCommentsfromER/CommentsfromICE/IPs
FL2LR105550 DesignertoPrepareRtC&UpdatedAIP 05-Aug-14 25-Aug-14
nd TBM DismantlingCavern TemporaryWorks 11-Jul-14 10-Sep-14
ission 11-Jul-14 10-Sep-14
NDCTSS1TS1T PreparationofNorthboundTBMDismantlingCavernTemporaryWorks 11-Jul-14 11-Aug-14 PreparationofNorthboundTB
NDCTSS1TS1T Review&CommentbyDHK 12-Aug-14 10-Sep-14
nn nnel Curved Section Cross Passages-TempWorks 23-May-14 10-Sep-14

Date

Revision

Checked

Approved

PrimaryBaseline

28-Feb-14 InitialWorksProgrammeRevB_BL

CriticalActivity

20-May-14 MonthlyReportNo.5

3-MonthsRolling Programme-MPR5

Milestone

9of1126-May-14/14:55DHK_aLTHK_3MRP_Client_orig

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.10) –May 2014

Contract 3

Z:\Jobs\2013\TCS00670(CV201303)\600\EM&A Report\Monthly EM&A Report\10th (May 2014)\R0184v2.docx

Agreement No. CE 45/2008 (CE) Liantang/Heung Yuen Wai Boundary Control Point and Associated Works

AUES

Monthly Environmental Monitoring & Audit Report (No.10) –May 2014

Contract 5

Z:\Jobs\2013\TCS00670(CV201303)\600\EM&A Report\Monthly EM&A Report\10th (May 2014)\R0184v2.docx

Contract No. CV/2013/03 - Liantang/Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works - Contract 5 3 Month Rolling Programme (20 May to 19 August 2014)
ID WBS Task Name Duration Start Finish % Complete 2014
Feb Mar Apr 1st Half May Jun Jul Aug Sep Oct Nov Dec 2nd Half
1 1 Key Dates 1110 days 28/3/2013 10/4/2016 0% 5/2 4/2 7/3 7/3 7/3 7/3 7/3 6/3 15/5 4/6 12/10 1/12
2 1.1 Contract Award & Commencement 15 days 28/3/2013 11/4/2013 100%
3 1.1.1 Letter of Acceptance 0 days 28/3/2013 28/3/2013 100%
4 1.1.2 Commencement of Works 0 days 11/4/2013 11/4/2013 100%
1.2 Site Possession Date 330 days 11/4/2013 7/3/2014 0%
6 1.2.1 Portion BCP 1 0 days 11/5/2013 11/5/2013 100%
7 1.2.2 Portion BCP 2 0 days 10/6/2013 10/6/2013 100%
8 1.2.3 Portion BCP 3 0 days 8/9/2013 8/9/2013 100%
9 1.2.4 Portion BCP 4 0 days 7/3/2014 7/3/2014 0%
1.2.5 Portion BCP 5 0 days 8/9/2013 8/9/2013 100%
11 1.2.6 Portion BCP 6 0 days 8/9/2013 8/9/2013 100%
12 1.2.7 Portion BCP 7 0 days 8/9/2013 8/9/2013 100%
13 1.2.8 Portion CR 2 0 days 7/12/2013 7/12/2013 100%
14 1.2.9 Portion CR 40 0 days 7/3/2014 7/3/2014 0%
1.2.10 Portion CR 41 0 days 7/3/2014 7/3/2014 0%
16 1.2.11 Portion CR 42 0 days 7/3/2014 7/3/2014 0%
17 1.2.12 Portion CR 44 0 days 5/2/2014 5/2/2014 100%
18 1.2.13 Area LMH 0 0 days 11/4/2013 11/4/2013 100%
19 1.2.14 Area LMH 1 0 days 8/9/2013 8/9/2013 100%
1.2.15 Area LMH 2 0 days 11/5/2013 11/5/2013 100%
21 1.2.16 Area LMH 3 0 days 7/3/2014 7/3/2014 100%
22 1.2.17 Area LMH 4 0 days 8/9/2013 8/9/2013 100%
23 1.2.18 Area LMH 5 0 days 8/10/2013 8/10/2013 100%
24 1.2.19 Area RS 1 0 days 11/5/2013 11/5/2013 100%
1.2.20 Area RS 2 (Omitted) 0 days 11/5/2013 11/5/2013 100%
26 1.2.21 Area RS 3 0 days 11/5/2013 11/5/2013 100%
27 1.2.22 Area RS 4 0 days 11/5/2013 11/5/2013 100%
28 1.3 Section Completion Date 976 days 8/8/2013 10/4/2016 0%
29 1.3.1 KD-1 Section I of the Works -G.I. field works 0 days 4/2/2014 4/2/2014 100%
1.3.2 KD-2 Section II of the Works -All laboratory tests for Section I 0 days 6/3/2014 6/3/2014 100%
31 1.3.3 KD-3 Section III of the Works -Site formation works for portion RS1, RS2 & RS3 0 days 8/8/2013 8/8/2013 100%
32 1.3.4 KD-4 Section IV of the Works -Village house within portion RS4 0 days 5/1/2014 5/1/2014 100%
33 1.3.5 KD-5 Section V of the Works -All works within portion RS4 exclude Section IV 0 days 5/1/2014 5/1/2014 100%
34 1.3.6 KD-7 Section VII of the Works -All works within Area CRD 0 days 15/5/2014 15/5/2014 100%
1.3.7 KD-8 Section VIII of the Works -All works within Area BCPA 0 days 12/10/2014 12/10/2014 0%
36 1.3.8 KD-8 Section IX of the Works -All works within Area BCPB 0 days 11/4/2015 11/4/2015 0%
37 1.3.9 KD-10 Section X of the Works -All works within Area BCPC 0 days 4/6/2014 4/6/2014 0%
38 1.3.10 KD-11 Section XI of the Works -All works within Area BCPD 0 days 11/4/2015 11/4/2015 0%
39 1.3.11 KD-12 Section XII of the Works -All works within Area LMH 0 days 1/12/2014 1/12/2014 0%
1.3.12 KD-13 Section XIII of the Works -Works not covered in any other Sections 0 days 11/4/2015 11/4/2015 0%
41 1.3.13 KD-14 Section XIV of the Works -Trees preservation and protection 0 days 11/4/2015 11/4/2015 0%
42 1.3.14 KD-15 Section XV of the Works -Landscape soft works 0 days 11/4/2015 11/4/2015 0%
43 1.3.15 KD-16 Section XVI of the Works -Establishment works for landscape soft works 0 days 10/4/2016 10/4/2016 0%
44 1.4 Stage Completion Date 60 days 8/8/2013 7/10/2013 100%
1.4.1 KD-17 Stage I of the Works -Temporary vehicular bridge J and temporary Lin Ma Hang Road 0 days 7/10/2013 7/10/2013 100%
46 1.4.2 KD-18 Stage II of the Works -Temporary ArchSD Depot 0 days 8/8/2013 8/8/2013 100%
47 2 Preliminaries and Statuary / Contractual Submissions 424 days 11/4/2013 9/6/2014 97%
48 2.1 Site Establishment 399 days 11/4/2013 15/5/2014 100%
53 2.2 Applications to Government Department 89 days 12/4/2013 9/7/2013 100%
58 2.3 Temporary Traffic Arrangement (TTA) Scheme for temp. LMH Rd 131 days 12/4/2013 20/8/2013 100%
63 2.4 Liaison with Utility Undertakers 363 days 12/4/2013 9/4/2014 100%
66 2.5 Environmental Baseline & Impact Monitoring 132 days 11/4/2013 21/8/2013 100%
Sang Hing Civil -Richwell Machinery JV Page 1 of 9 20140520 3 mth rolling Programme WP(02)