Name of Department : CEDD Contract No./ Work Order No. : CV/2012/08
(All quantities shall be rounded off to 3 decimal places)
Month | Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) | Actual Quantities of Other C&D Materials / Wastes Generated | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantities Generated [a+b+c+d) | Broken Concrete (including rock for recycling into aggregates) (a) | Reused in the Contract (b) | Reused in Other Projects (c) | Disposed as Public Fill (d) | Imported C&D Material | Metal (in '000kg) | Paper/ Cardboard Packaging (in '000kg) | Plastic (bottles/containers, plastic sheets/ foams from package material) (in '000kg) | Chemical Waste (in '000kg) | Others (e.g. General Refuse etc.) (in '000m3) | |
January | 72.2029 | 0.0000 | 0.6482 | 31.8061 | 39.7486 | 0.9345 | 26.2000 | 0.0000 | 0.0000 | 1.2320 | 0.1247 |
February | 55.6715 | 0.0000 | 1.0145 | 38.3484 | 16.3085 | 1.3108 | 8.3800 | 0.9800 | 0.0000 | 1.4080 | 0.1089 |
March | 34.1757 | 0.0000 | 0.3241 | 29.3514 | 4.5003 | 1.0325 | 44.1700 | 0.0000 | 0.0000 | 11.9680 | 0.0732 |
April | 86.9048 | 0.0000 | 0.7045 | 32.8811 | 53.3191 | 1.3786 | 23.6420 | 0.4000 | 0.0000 | 1.6456 | 0.1306 |
May | 77.5386 | 0.0000 | 0.1268 | 38.9050 | 38.5068 | 4.4426 | 44.8000 | 0.3500 | 0.0000 | 2.7280 | 0.1246 |
June | 62.4192 | 0.0000 | 0.5848 | 45.2952 | 16.5392 | 1.0836 | 67.7300 | 0.3700 | 0.0000 | 1.7600 | 0.0916 |
Half-year total | 388.9127 | 0.0000 | 3.4030 | 216.5873 | 168.9224 | 10.1826 | 214.9220 | 2.1000 | 0.0000 | 20.7416 | 0.6536 |
July | 65.3701 | 0.0000 | 0.4227 | 25.0255 | 39.9219 | 0.0000 | 11.4000 | 0.0000 | 0.0000 | 2.9920 | 0.1794 |
August | 0.0000 | ||||||||||
September | 0.0000 | ||||||||||
October | 0.0000 | ||||||||||
November | 0.0000 | ||||||||||
December | 0.0000 | ||||||||||
Yearly Total | 454.2827 | 0.0000 | 3.8257 | 241.6127 | 208.8443 | 10.1826 | 226.3220 | 2.1000 | 0.0000 | 23.7336 | 0.8330 |
(All quantities shall be rounded off to 3 decimal places)
Year | Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) | Actual Quantities of Other C&D Materials / Wastes Generated | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantities Generated [a+b+c+d) | Broken Concrete (including rock for recycling into aggregates) (a) | Reused in the Contract (b) | Reused in Other Projects (c) | Disposed as Public Fill (d) | Imported C&D Material | Metal (in '000kg) | Paper/ Cardboard Packaging (in '000kg) | Plastic (bottles/containers, plastic sheets/ foams from package material) (in '000kg) | Chemical Waste (in '000kg) | Others (e.g. General Refuse etc.) (in '000m3) | |
2013 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 | 0.0000 |
2014 | 425.4406 | 0.0000 | 2.7362 | 376.3945 | 46.3099 | 5.6245 | 3.2100 | 0.4390 | 0.0070 | 10.8800 | 2.2609 |
2015 | 570.9459 | 0.0000 | 20.8159 | 543.2162 | 6.9138 | 4.5492 | 14.1300 | 3.9220 | 1.5000 | 16.1920 | 1.1696 |
2016 | 454.2827 | 0.0000 | 3.8257 | 241.6127 | 208.8443 | 10.1826 | 226.3220 | 2.1000 | 0.0000 | 23.7336 | 0.8330 |
2017 | |||||||||||
2018 | |||||||||||
Total | 1450.6692 | 0.0000 | 27.3778 | 1161.2235 | 262.0680 | 20.3562 | 243.6620 | 6.4610 | 1.5070 | 50.8056 | 4.2635 |
Remark: | ||||||
---|---|---|---|---|---|---|
1) Density of C&D material to be | 2.2 | metric ton/m3 | 3) Density of Spent Oil to be | 0.88 | metric ton/m3 | |
2) Density of General Refuse to be | 1.6 | metric ton/m3 |
Name of Department: CEDD Contract No.: CV/2012/09
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in m3) | (in '000m3) | |
Jan | 2.683 | 0.253 | 0.030 | 0.000 | 2.400 | 0.799 | 0.001 | 0.000 | 0.000 | 0.000 | 0.115 |
Feb | 1.877 | 0.651 | 0.020 | 0.000 | 1.205 | 1.141 | 0.000 | 0.000 | 0.000 | 0.000 | 0.110 |
Mar | 1.501 | 0.417 | 0.000 | 0.000 | 1.084 | 0.831 | 0.000 | 0.000 | 0.001 | 0.000 | 0.090 |
Apr | 0.472 | 0.046 | 0.018 | 0.000 | 0.408 | 0.647 | 0.000 | 0.000 | 0.000 | 0.000 | 0.135 |
May | 0.488 | 0.013 | 0.000 | 0.000 | 0.475 | 2.479 | 0.000 | 0.000 | 0.000 | 0.000 | 0.105 |
Jun | 0.523 | 0.103 | 0.000 | 0.000 | 0.420 | 0.716 | 0.000 | 0.000 | 0.001 | 0.000 | 0.135 |
Sub-total | 7.544 | 1.483 | 0.068 | 0.000 | 5.993 | 6.613 | 0.001 | 0.000 | 0.002 | 0.000 | 0.690 |
Jul | 0.565 | 0.019 | 0.000 | 0.000 | 0.546 | 1.407 | 0.000 | 0.001 | 0.004 | 1.000 | 0.085 |
Aug | |||||||||||
Sep | |||||||||||
Oct | |||||||||||
Nov | |||||||||||
Dec | |||||||||||
Total | 8.109 | 1.503 | 0.068 | 0.000 | 6.538 | 8.021 | 0.001 | 0.001 | 0.006 | 1.000 | 0.775 |
Note: 1. Assume the density of soil fill is 2 ton/m3 .
Contract No. CV/2013/03 Particular Specification Appendix 1.27 | Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5 | |
---|---|---|
Name of Department: CEDD | ||
Monthly Summary Waste Flow Table for 2016 |
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics | Chemical Waste | Others, e.g. general refuse | ||
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) | ||
JAN | 0 | 0 | 0 | 0 | 0 | 0.235 | 0 | 0 | 0 | 0 | 0.06 | |
FEB | 0 | 0 | 0 | 0 | 0 | 0.141 | 0 | 0 | 0 | 0 | 0.045 | |
MAR | 0 | 0 | 0 | 0 | 0 | 0.1785 | 0 | 0 | 0 | 0 | 0.055 | |
APRIL | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.03 | |
MAY | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.015 | |
JUN | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.062 | 0 | 0 | 0.01 | |
Sub Total | 0 | 0 | 0 | 0 | 0 | 0.5545 | 0 | 0.062 | 0 | 0 | 0.215 | |
JUL | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0.005 | |
AUG | ||||||||||||
SEP | ||||||||||||
OCT | ||||||||||||
NOV | ||||||||||||
DEC | ||||||||||||
Total | 0 | 0 | 0 | 0 | 0 | 0.55 | 0 | 0.062 | 0 | 0 | 0.22 |
Notes:
Contract No. CV/2013/03 Particular Specification Appendix 1.27
Name of Department: CEDD
Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5
Forecast of Total Quantities of C&D Materials to be Generated from the Contract (see Note 4) | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rocks and Large Broken Concrete | Reused in the Contract | Reused in Other Projects | Disposed as Public Fill | Imported Fill | Metal | Paper / cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) |
0 | 0 | 0 | 0 | 0 | 350 | 30 | 4 | 2 | 1 | 4 |
Notes:
- Hard Rocks and Large Broken Concrete = Cannot be defined at this stage
-Imported Fill = Estimated by the Contractor = 1 loading = 8m 3
-Metal = Estimated by the Contractor
-Paper/cardboard packaging = Estimated by the Contractor
-Plastics = Estimated by the Contractor
- Chemical Waste = Estimated by the Contractor (Spent lubricating oil, assume density 0.9kg/L)
-Other, e.g. general refuse = Estimated by the Contractor
Name of Person completing the record: K.M. Lui (EO) Project : Liangtang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 Contract No.: CV/2013/08
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of C&D Wastes Generated Monthly | |||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Disposed as Public Fill | Imported Fill | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Others, e.g. general refuse | |
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in ‘000m3) | (in '000 kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in ‘000 m3) | |
Jan | 58.943 | 0 | 3.811 | 12.131 | 43.001 | 31.248 | 0 | 0 | 0 | 0 | 0.695 |
Feb | 74.418 | 0 | 8.785 | 39.85 | 25.783 | 6.552 | 0 | 0.097 | 0 | 0 | 0.339 |
Mar | 43.764 | 0 | 6.438 | 12.034 | 25.292 | 3.288 | 0 | 0.206 | 0.007 | 0 | 0.042 |
Apr | 33.767 | 0 | 1.933 | 5.759 | 26.075 | 0 | 0 | 0.221 | 0 | 0 | 0.070 |
May | 51.115 | 0 | 3.229 | 17.469 | 30.417 | 0.928 | 0 | 0.211 | 0 | 0 | 0.079 |
Jun | 61.126 | 0 | 6.921 | 23.286 | 30.919 | 3.693 | 0 | 0.166 | 0 | 0 | 0.043 |
Sub-total | 323.133 | 0 | 31.117 | 110.529 | 181.487 | 45.709 | 0 | 0.901 | 0.007 | 0 | 1.268 |
Jul | 73.407 | 0 | 0.951 | 32.858 | 39.598 | 0.827 | 0 | 0 | 0 | 0 | 0.094 |
Aug | |||||||||||
Sep | |||||||||||
Oct | |||||||||||
Nov | |||||||||||
Dec | |||||||||||
Total | 565.763 | 0 | 50.602 | 160.171 | 354.99 | 53.785 | 0 | 1.195 | 0.007 | 32.28 | 4.438 |
Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.
MONTHLY SUMMARY WASTE FLOW TABLE
Name of Department: CEDD Liantang/ Heung Yuen Wai Boundary Control Point
Site Formation and Infrastructure Works – Contract 7
Monthly Summary Waste Flow Table for 2016 (year)
Month | Actual Quantities of Inert C&D Materials Generated Monthly | Actual Quantities of Inert C&D Wastes Generated Monthly | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Total Quantity Generated | Hard Rock and Large Broken Concrete | Reused in the Contract | Reused in other Projects | Public Fill Disposed as | Imported Fill | Metals | Paper/cardboard packaging | Plastic (see Note 3) | Chemical Waste | Others, e.g. general refuse | ||
(in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000m3) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000kg) | (in '000m3) | ||
Jan | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Feb | 0.16 | 0 | 0 | 0 | 0.16 | 0 | 0 | 0 | 0 | 0 | 0 | |
Mar | 0.135 | 0 | 0 | 0 | 0.135 | 0 | 0 | 0 | 0 | 0 | 0.005 | |
Apr | 0.313 | 0 | 0 | 0 | 0.313 | 0 | 0 | 0 | 0 | 0 | 0.005 | |
May | 0.505 | 0 | 0 | 0 | 0.505 | 0 | 0 | 0 | 0 | 0 | 0 | |
June | 0.613 | 0 | 0 | 0 | 0.613 | 0 | 0 | 0.005 | 0.001 | 0 | 0 | |
Sub-total | 1.726 | 0 | 0 | 0 | 1.726 | 0 | 0 | 0.005 | 0.001 | 0 | 0.01 | |
July | 0.207 | 0 | 0 | 0 | 0.207 | 0 | 0 | 0.047 | 0.001 | 0 | 0 | |
Aug | ||||||||||||
Sept | ||||||||||||
Oct | ||||||||||||
Nov | ||||||||||||
Dec | ||||||||||||
Total | 1.933 | 0 | 0 | 0 | 1.933 | 0 | 0 | 0.052 | 0.002 | 0 | 0.01 |
Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.
(2) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
SSC505
Monthly Summary Waste Flow Table for 2016 [year] [to be submitted not later than the 15th day of each month following reporting month] (All quantities shall be rounded off to 3 decimal places.)
Month | Actual Quantities of Inert Construction Waste Generated Monthly | ||||
---|---|---|---|---|---|
(a)=(b)+(c)+(d)+(e) Total Quantity Generated | (b) Broken Concrete (see Note 4) | (c) Reused in the Contract | (d) Reused in other Projects | (e) Disposed of as Public Fill | |
(in ‘000m3) | (in ‘000m3) | (in ‘000m3) | (in ‘000m3) | (in ‘000m3) | |
Jan | 0.800 | 0 | 0 | 0 | 0.800 |
Feb | 0.858 | 0 | 0 | 0 | 0.858 |
Mar | 0.793 | 0 | 0 | 0 | 0.793 |
Apr | 0.1105 | 0 | 0 | 0 | 0.1105 |
May | 1.087 | 0 | 1.074 | 0 | 0.013 |
Jun | 8.645 | 0 | 8.541 | 0 | 0.104 |
Sub-total | 12.293 | 0 | 9.615 | 0 | 2.678 |
Jul | 2.94201 | 0 | 2.88351 | 0 | 0.0585 |
Aug | |||||
Sep | |||||
Oct | |||||
Nov | |||||
Dec | |||||
Total | 15.235 | 0 | 12.49851 | 0 | 2.737 |
Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011
Page 1
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
Month | Actual Quantities of Non-inert Construction Waste Generated Monthly | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Timber | Metals | Paper/ cardboard packaging | Plastics (see Note 3) | Chemical Waste | Other Recyclable Materials _________________ (see Page 3) | General Refuse disposed of at Landfill | |||||||
(in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000kg) | (in ‘000m3) | |||||||
generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | recycled | generated | |
Jan | 0.000 | 0.000 | 4.73 | 4.73 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.000 | 0.072 |
Feb | 0.000 | 0.000 | 0.0004 | 0.0004 | 0.0186 | 0.0186 | 0.000 | 0.000 | 0.000 | 0.000 | 0.021 | 0.021 | 0.065 |
Mar | 0 | 0 | 52.752 | 52.752 | 0.044 | 0.044 | 0 | 0 | 0 | 0 | 0.05 | 0.05 | 0.059 |
Apr | 0 | 0 | 1465.5906 | 1465.5906 | 0.09 | 0.09 | 0 | 0 | 0 | 0 | 0.084 | 0.084 | 0.091 |
May | 0 | 0 | 1587.5818 | 1587.5818 | 0 | 0 | 0.004 | 0.004 | 0 | 0 | 0.153 | 0.153 | 0.156 |
Jun | 0 | 0 | 725.0582 | 725.0582 | 0.33 | 0.33 | 0.0045 | 0.0045 | 0 | 0 | 0.067 | 0.067 | 0.117 |
Sub-total | 0 | 0 | 3818.7330 | 3818.7330 | 0.4826 | 0.4826 | 0.0085 | 0.0085 | 0 | 0 | 0.375 | 0.375 | 0.559 |
Jul | 0 | 0 | 162.93 | 162.93 | 0.43 | 0.43 | 0.02 | 0.02 | 0 | 0 | 0.1937 | 0.1937 | 0.189 |
Aug | |||||||||||||
Sep | |||||||||||||
Oct | |||||||||||||
Nov | |||||||||||||
Dec | |||||||||||||
Total | 0 | 0 | 3981.663 | 3981.663 | 0.9126 | 0.9126 | 0.0285 | 0.0285 | 0 | 0 | 0.5687 | 0.5687 | 0.748 |
Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011
Page 2
Architectural Services Department | Form No. D/OI.03/09.002 |
---|
Description of mode and details of recycling if any for the month e.g. XX kg of used timber was sent to YY site for transformation into fertilizers | |||||
---|---|---|---|---|---|
12.7kg of cans were sent to Wong Kei and Pui Kei for recycling. | 430kg of papers were sent to Kin Xun for recycling. | 20kg of plastic bottles and 181kg of glass bottles were sent to Action Health for recycling. | 126.88 tons of scrap metals from LCAL were sent for recycling. | 36.05 tons of scrap metals from subcontractors were sent for recycling |
Notes: | (1) | The performance targets are given in the Particular Specification on Environmental Management Plan. |
(2) | The waste flow table shall also include construction waste that are specified in the Contract to be imported for use at the site. | |
(3) | Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material. | |
(4) | Broken concrete for recycling into aggregates. | |
(5) | If necessary, use the conversion factor: 1 full load of dumping truck being equivalent to 6.5 m3 by volume. |