Dragages QSE Lock-up

Name of Department : CEDD Contract No./ Work Order No. : CV/2012/08

Appendix I - Monthly Summary Waste Flow Table for 2016

(All quantities shall be rounded off to 3 decimal places)

Month Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) Actual Quantities of Other C&D Materials / Wastes Generated
Total Quantities Generated [a+b+c+d) Broken Concrete (including rock for recycling into aggregates) (a) Reused in the Contract (b) Reused in Other Projects (c) Disposed as Public Fill (d) Imported C&D Material Metal (in '000kg) Paper/ Cardboard Packaging (in '000kg) Plastic (bottles/containers, plastic sheets/ foams from package material) (in '000kg) Chemical Waste (in '000kg) Others (e.g. General Refuse etc.) (in '000m3)
January 72.2029 0.0000 0.6482 31.8061 39.7486 0.9345 26.2000 0.0000 0.0000 1.2320 0.1247
February 55.6715 0.0000 1.0145 38.3484 16.3085 1.3108 8.3800 0.9800 0.0000 1.4080 0.1089
March 34.1757 0.0000 0.3241 29.3514 4.5003 1.0325 44.1700 0.0000 0.0000 11.9680 0.0732
April 86.9048 0.0000 0.7045 32.8811 53.3191 1.3786 23.6420 0.4000 0.0000 1.6456 0.1306
May 77.5386 0.0000 0.1268 38.9050 38.5068 4.4426 44.8000 0.3500 0.0000 2.7280 0.1246
June 62.4192 0.0000 0.5848 45.2952 16.5392 1.0836 67.7300 0.3700 0.0000 1.7600 0.0916
Half-year total 388.9127 0.0000 3.4030 216.5873 168.9224 10.1826 214.9220 2.1000 0.0000 20.7416 0.6536
July 65.3701 0.0000 0.4227 25.0255 39.9219 0.0000 11.4000 0.0000 0.0000 2.9920 0.1794
August 0.0000
September 0.0000
October 0.0000
November 0.0000
December 0.0000
Yearly Total 454.2827 0.0000 3.8257 241.6127 208.8443 10.1826 226.3220 2.1000 0.0000 23.7336 0.8330

(All quantities shall be rounded off to 3 decimal places)

Year Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) Actual Quantities of Other C&D Materials / Wastes Generated
Total Quantities Generated [a+b+c+d) Broken Concrete (including rock for recycling into aggregates) (a) Reused in the Contract (b) Reused in Other Projects (c) Disposed as Public Fill (d) Imported C&D Material Metal (in '000kg) Paper/ Cardboard Packaging (in '000kg) Plastic (bottles/containers, plastic sheets/ foams from package material) (in '000kg) Chemical Waste (in '000kg) Others (e.g. General Refuse etc.) (in '000m3)
2013 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
2014 425.4406 0.0000 2.7362 376.3945 46.3099 5.6245 3.2100 0.4390 0.0070 10.8800 2.2609
2015 570.9459 0.0000 20.8159 543.2162 6.9138 4.5492 14.1300 3.9220 1.5000 16.1920 1.1696
2016 454.2827 0.0000 3.8257 241.6127 208.8443 10.1826 226.3220 2.1000 0.0000 23.7336 0.8330
2017
2018
Total 1450.6692 0.0000 27.3778 1161.2235 262.0680 20.3562 243.6620 6.4610 1.5070 50.8056 4.2635
Remark:
1) Density of C&D material to be 2.2 metric ton/m3 3) Density of Spent Oil to be 0.88 metric ton/m3
2) Density of General Refuse to be 1.6 metric ton/m3

Name of Department: CEDD Contract No.: CV/2012/09

Monthly Summary Waste Flow Table for 2016 (year)

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in m3) (in '000m3)
Jan 2.683 0.253 0.030 0.000 2.400 0.799 0.001 0.000 0.000 0.000 0.115
Feb 1.877 0.651 0.020 0.000 1.205 1.141 0.000 0.000 0.000 0.000 0.110
Mar 1.501 0.417 0.000 0.000 1.084 0.831 0.000 0.000 0.001 0.000 0.090
Apr 0.472 0.046 0.018 0.000 0.408 0.647 0.000 0.000 0.000 0.000 0.135
May 0.488 0.013 0.000 0.000 0.475 2.479 0.000 0.000 0.000 0.000 0.105
Jun 0.523 0.103 0.000 0.000 0.420 0.716 0.000 0.000 0.001 0.000 0.135
Sub-total 7.544 1.483 0.068 0.000 5.993 6.613 0.001 0.000 0.002 0.000 0.690
Jul 0.565 0.019 0.000 0.000 0.546 1.407 0.000 0.001 0.004 1.000 0.085
Aug
Sep
Oct
Nov
Dec
Total 8.109 1.503 0.068 0.000 6.538 8.021 0.001 0.001 0.006 1.000 0.775

Note: 1. Assume the density of soil fill is 2 ton/m3 .

  1. Assume the density of rock and broken concrete is 2.5 ton/m3 .
  2. Assume each truck of C&D wastes is 5m3 .
  3. The inert C&D materials except slurry and bentonite are disposed at Tuen Mun 38.
  4. The slurry and bentonite are disposed at Tseung Kwun O 137.
  5. The non-inert C&D wastes are disposed at NENT.
  6. Assume the density of metal is 7,850 kg/m3 .
Contract No. CV/2013/03 Particular Specification Appendix 1.27 Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5
Name of Department: CEDD
Monthly Summary Waste Flow Table for 2016
Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
JAN 0 0 0 0 0 0.235 0 0 0 0 0.06
FEB 0 0 0 0 0 0.141 0 0 0 0 0.045
MAR 0 0 0 0 0 0.1785 0 0 0 0 0.055
APRIL 0 0 0 0 0 0 0 0 0 0 0.03
MAY 0 0 0 0 0 0 0 0 0 0 0.015
JUN 0 0 0 0 0 0 0 0.062 0 0 0.01
Sub Total 0 0 0 0 0 0.5545 0 0.062 0 0 0.215
JUL 0 0 0 0 0 0 0 0 0 0 0.005
AUG
SEP
OCT
NOV
DEC
Total 0 0 0 0 0 0.55 0 0.062 0 0 0.22

Notes:

Contract No. CV/2013/03 Particular Specification Appendix 1.27

Name of Department: CEDD

Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5

Forecast of Total Quantities of C&D Materials to be Generated from the Contract (see Note 4)
Total Quantity Generated Hard Rocks and Large Broken Concrete Reused in the Contract Reused in Other Projects Disposed as Public Fill Imported Fill Metal Paper / cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
0 0 0 0 0 350 30 4 2 1 4

Notes:

(1)
The performance targets are given in PS clause 6(14) above.
(2)
The waste flow table shall also include C&D materials that are specified in the Contractor to be imported for use at the Site.
(3)
Plastic refer to plastic bottles/containers, plastic sheets/foam from packaging material.
(4)
The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the nature

- Hard Rocks and Large Broken Concrete = Cannot be defined at this stage

-Imported Fill = Estimated by the Contractor = 1 loading = 8m 3

-Metal = Estimated by the Contractor

-Paper/cardboard packaging = Estimated by the Contractor

-Plastics = Estimated by the Contractor

- Chemical Waste = Estimated by the Contractor (Spent lubricating oil, assume density 0.9kg/L)

-Other, e.g. general refuse = Estimated by the Contractor

Monthly Summary Waste Flow Table for 2016 (year)

Name of Person completing the record: K.M. Lui (EO) Project : Liangtang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 Contract No.: CV/2013/08

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in ‘000m3) (in '000 kg) (in '000kg) (in '000kg) (in '000kg) (in ‘000 m3)
Jan 58.943 0 3.811 12.131 43.001 31.248 0 0 0 0 0.695
Feb 74.418 0 8.785 39.85 25.783 6.552 0 0.097 0 0 0.339
Mar 43.764 0 6.438 12.034 25.292 3.288 0 0.206 0.007 0 0.042
Apr 33.767 0 1.933 5.759 26.075 0 0 0.221 0 0 0.070
May 51.115 0 3.229 17.469 30.417 0.928 0 0.211 0 0 0.079
Jun 61.126 0 6.921 23.286 30.919 3.693 0 0.166 0 0 0.043
Sub-total 323.133 0 31.117 110.529 181.487 45.709 0 0.901 0.007 0 1.268
Jul 73.407 0 0.951 32.858 39.598 0.827 0 0 0 0 0.094
Aug
Sep
Oct
Nov
Dec
Total 565.763 0 50.602 160.171 354.99 53.785 0 1.195 0.007 32.28 4.438

Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.

(2)
Plastics refer to plastic bottles/containers, plastic sheets/ foam from packaging materials.
(3)
Broken concrete for recycling into aggregates.
Appendix I

MONTHLY SUMMARY WASTE FLOW TABLE

Name of Department: CEDD Liantang/ Heung Yuen Wai Boundary Control Point

Contract Title: Contract No.: NE/2014/03

Site Formation and Infrastructure Works – Contract 7

Monthly Summary Waste Flow Table for 2016 (year)

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of Inert C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Public Fill Disposed as Imported Fill Metals Paper/cardboard packaging Plastic (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
Jan 0 0 0 0 0 0 0 0 0 0 0
Feb 0.16 0 0 0 0.16 0 0 0 0 0 0
Mar 0.135 0 0 0 0.135 0 0 0 0 0 0.005
Apr 0.313 0 0 0 0.313 0 0 0 0 0 0.005
May 0.505 0 0 0 0.505 0 0 0 0 0 0
June 0.613 0 0 0 0.613 0 0 0.005 0.001 0 0
Sub-total 1.726 0 0 0 1.726 0 0 0.005 0.001 0 0.01
July 0.207 0 0 0 0.207 0 0 0.047 0.001 0 0
Aug
Sept
Oct
Nov
Dec
Total 1.933 0 0 0 1.933 0 0 0.052 0.002 0 0.01

Notes: (1) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.

(2) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.

Architectural Services Department Form No. D/OI.03/09.002

SSC505

Contract No. / Works Order No.:

Monthly Summary Waste Flow Table for 2016 [year] [to be submitted not later than the 15th day of each month following reporting month] (All quantities shall be rounded off to 3 decimal places.)

Month Actual Quantities of Inert Construction Waste Generated Monthly
(a)=(b)+(c)+(d)+(e) Total Quantity Generated (b) Broken Concrete (see Note 4) (c) Reused in the Contract (d) Reused in other Projects (e) Disposed of as Public Fill
(in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3) (in ‘000m3)
Jan 0.800 0 0 0 0.800
Feb 0.858 0 0 0 0.858
Mar 0.793 0 0 0 0.793
Apr 0.1105 0 0 0 0.1105
May 1.087 0 1.074 0 0.013
Jun 8.645 0 8.541 0 0.104
Sub-total 12.293 0 9.615 0 2.678
Jul 2.94201 0 2.88351 0 0.0585
Aug
Sep
Oct
Nov
Dec
Total 15.235 0 12.49851 0 2.737

Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011

Page 1

Architectural Services Department Form No. D/OI.03/09.002
Month Actual Quantities of Non-inert Construction Waste Generated Monthly
Timber Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Other Recyclable Materials _________________ (see Page 3) General Refuse disposed of at Landfill
(in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000kg) (in ‘000m3)
generated recycled generated recycled generated recycled generated recycled generated recycled generated recycled generated
Jan 0.000 0.000 4.73 4.73 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.072
Feb 0.000 0.000 0.0004 0.0004 0.0186 0.0186 0.000 0.000 0.000 0.000 0.021 0.021 0.065
Mar 0 0 52.752 52.752 0.044 0.044 0 0 0 0 0.05 0.05 0.059
Apr 0 0 1465.5906 1465.5906 0.09 0.09 0 0 0 0 0.084 0.084 0.091
May 0 0 1587.5818 1587.5818 0 0 0.004 0.004 0 0 0.153 0.153 0.156
Jun 0 0 725.0582 725.0582 0.33 0.33 0.0045 0.0045 0 0 0.067 0.067 0.117
Sub-total 0 0 3818.7330 3818.7330 0.4826 0.4826 0.0085 0.0085 0 0 0.375 0.375 0.559
Jul 0 0 162.93 162.93 0.43 0.43 0.02 0.02 0 0 0.1937 0.1937 0.189
Aug
Sep
Oct
Nov
Dec
Total 0 0 3981.663 3981.663 0.9126 0.9126 0.0285 0.0285 0 0 0.5687 0.5687 0.748

Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011

Page 2

Architectural Services Department Form No. D/OI.03/09.002
Description of mode and details of recycling if any for the month e.g. XX kg of used timber was sent to YY site for transformation into fertilizers
12.7kg of cans were sent to Wong Kei and Pui Kei for recycling. 430kg of papers were sent to Kin Xun for recycling. 20kg of plastic bottles and 181kg of glass bottles were sent to Action Health for recycling. 126.88 tons of scrap metals from LCAL were sent for recycling. 36.05 tons of scrap metals from subcontractors were sent for recycling
Notes: (1) The performance targets are given in the Particular Specification on Environmental Management Plan.
(2) The waste flow table shall also include construction waste that are specified in the Contract to be imported for use at the site.
(3) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material.
(4) Broken concrete for recycling into aggregates.
(5) If necessary, use the conversion factor: 1 full load of dumping truck being equivalent to 6.5 m3 by volume.

Architectural Services Department First Issue Date -20 : 07 : 2009 Standard Form No. D/OI.03/09.002 Current Issue Date -21 : 09 : 2011