Name of Department: CEDD Contract No.: CV/2012/09

Monthly Summary Waste Flow Table for 2014 (year)

Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3)
Jan 0.409 0.084 0 0 0.409 0.200 0 0 0.010 0 0.110
Feb 1.697 0.356 0.380 0 1.473 0 0.002 0 0 0.019 0.040
Mar 3.954 0.506 1.092 0 2.862 0 0 0 0 0 0.265
Apr 1.600 0.054 0.672 0 0.928 0.200 0 0 0 0.020 0.135
May
Jun
Sub-total 7.660 1.000 2.144 0.000 5.672 0.400 0.002 0.000 0.010 0.039 0.550
Jul
Aug
Sep
Oct
Nov
Dec
Total 7.660 1.000 2.144 0.000 5.672 0.400 0.002 0.000 0.010 0.039 0.550

Note: 1. Assume the density of soil fill is 2 ton/m3.

  1. Assume the density of rock and broken concrete is 2.5 ton/m3.
  2. Assume each truck of C&D wastes is 5m.
  3. The inert C&D materials except slurry and bentonite are disposed at Tuen Mun 38.
  4. The slurry and bentonite are disposed at Tseung Kwun O 137.
  5. The non-inert C&D wastes are disposed at NENT.
  6. Assume the density of metal is 7,850 kg/m3.

3

Contract No. CV/2013/03 Particular Specification Appendix 1.27 Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5
Name of Department: CEDD
Monthly Summary Waste Flow Table for 2014
Month Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly
Total Quantity Generated Hard Rock and Large Broken Concrete Reused in the Contract Reused in other Projects Disposed as Public Fill Imported Fill Metals Paper/ cardboard packaging Plastics Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
JAN 0 0 0 0 0 16.571 0 0 0 0 0.85
FEB 0 0 0 0 0 18.672 0 0 0 0 0.005
MAR 0 0 0 0 0 2.968 0 0 0 6 0.01
APRIL 0 0 0 0 0 1.664 0.87 0 0 0 0.245
MAY
JUN
Sub Total 0 0 0 0 0 39.875 0.87 0 0 6 1.11
JUL
AUG
SEP
OCT
NOV
DEC
Total 0 0 0 0 0 39.88 0.87 0 0 6 1.11

Notes:

Contract No. CV/2013/03 Particular Specification Appendix 1.27

Name of Department: CEDD

Liantang/Heung Yuen Wai Boundary Control Point Site Formation and infrastructure Works Contract 5

Forecast of Total Quantities of C&D Materials to be Generated from the Contract (see Note 4)
Total Quantity Generated Hard Rocks and Large Broken Concrete Reused in the Contract Reused in Other Projects Disposed as Public Fill Imported Fill Metal Paper / cardboard packaging Plastics (see Note 3) Chemical Waste Others, e.g. general refuse
(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)
0 0 0 0 0 350 30 4 2 1 4

Notes:

(1)
The performance targets are given in PS clause 6(14) above.
(2)
The waste flow table shall also include C&D materials that are specified in the Contractor to be imported for use at the Site.
(3)
Plastic refer to plastic bottles/containers, plastic sheets/foam from packaging material.
(4)
The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the nature

- Hard Rocks and Large Broken Concrete = Cannot be defined at this stage

-Imported Fill = Estimated by the Contractor = 1 loading = 8m 3

-Metal = Estimated by the Contractor

-Paper/cardboard packaging = Estimated by the Contractor

-Plastics = Estimated by the Contractor

- Chemical Waste = Estimated by the Contractor (Spent lubricating oil, assume density 0.9kg/L)

-Other, e.g. general refuse = Estimated by the Contractor